![Stageline SL100 2018 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/stageline/sl100-2018/sl100-2018_user-manual_1357294032.webp)
30
1. SL100_User’s Manual_2017
8.6 Stage Guardrails
• Insert the upper hook of the bracket into the groove of the floor panel.
• Push the guardrail legs down until the hook sits on the groove. The lower end of the bracket
should be in contact with the floor panel side.
• Secure by turning the handle clockwise until the blocking plate is in contact with the underside
of the stage.
.
• Do not overtighten as it will not have any bearing on resistance to weight.
8.7 Extension Platforms
The Stageline extension platforms will allow you to increase the stage dimensions.
They can also be used to install skirting, stairways and guardrails.
• Have all necessary supports and screwjacks ready and positioned on the ground, where
they will be required before starting installation.
• Slide the first set of the platforms into the brackets located along the stage sides.
• To join two or more platforms together, always use the side with the lip first, to
facilitate insertion of the second platform.
• Insert the leg extensions and screwjacks. Level.
• The 3’ (0.91m) wide guardrail is to be used next to stairways.
Do not allow personnel to walk on or under rows of platforms before all supports have been installed and
tightened and all platforms leveled.
CAUTION
8.8 Extension Platform Guardrails
• Insert the upper hook of the bracket into the groove of the extension platform.
• Push the guardrail down until the hook sits on the groove.
The lower end section of the bracket should be in contact with the lower side
of the platform.
• Secure by turning the handle clockwise until the blocking plate is in contact with
the underside of the platform.
• Do not overtighten as it will not have any bearing on resistance to weight.
Lip
Plate