![Stageline SL100 2018 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/stageline/sl100-2018/sl100-2018_user-manual_1357294012.webp)
10
1. SL100_User’s Manual_2017
• Insert pins into the lower holes of the front and rear telescopic columns in order to lock the
middle section of the columns into place.
• Raise the roof structure to approximately 4’ (1.2 m) high or until you see the pin holes under
the top section of the columns. Pin and secure.
• Lower the roof structure enough to remove the pins at the bottom of the columns
middle sections.
• Remove the middle pin in the corner posts. Pull on the bottom section.
• Resume raising the roof structure. Once the roof structure is fully raised, pin and
secure the bottom of the middle section with the remaining two (2) locking pins.
Gently lower the roof to settle its weight on the column pins.
• Pin and secure the downstage and upstage corner posts to the floor. Gently lower the roof
panels to settle their weight on the corner post pins.
• Attach and tighten all hooks at the bottom of the windwall to the stage floor, if applicable.
Refer to the Rigging Plan for lifting restrictions.
CAUTION
3.3 Final Stage Setup
3.3.1 Installing Stairways
There are two different stairways available. If you purchased the adjustable stairway, please refer to point 8.10 for installation.
• Slide the stairway into the stage floor edge brackets. If positioned onto an extension platform,
set against platform edge. Remove the pin securing the hook on each side of the first upper
step, position hook, pin and secure.
• Remove the pin on each interior side of the stairway between the first and second steps off
the ground.
• Adjust the legs. Pin and secure. Maximum allowable load is 600 lb (272 kg).
• Insert the handrails into the receptacles. Pin and secure.
3.3.2 Installing Guardrails
To install guardrails as a safety measure for your stage floor, please refer to point 8.6.
For extension platform guardrails, please refer to point 8.8.
SL100