Ashby-P Insert
5
BEFORE INSTALLATION THOROUGHLY
READ AND UNDERSTAND THIS MANUAL
SAFETY NOTICE
PLEASE READ THE ENTIRE MANUAL BEFORE INSTALLING AND USING YOUR NEW MULTI-FUEL INSERT.
FAILURE TO FOLLOW INSTRUCTIONS MAY RESULT IN POPERTY DAMAGE, BODILY INJURY, OR EVEN
DEATH.
INSTALLATION CHECK LIST
FOR USE IN THE U.S. AND CANADA
MOBILE HOME APPROVED
CHECK WITH LOCAL AUTHORITIES AND OBTAIN NEEDED PERMITS
WE RECOMMEND INSTALLATION BY A QUALIFIED PROFESSIONAL.
BEFORE STARTING THE MULTI-FUEL INSERT FOR THE FIRST TIME
1. Under certain conditions outside combustion air is recommended. Use only approved parts. When using
out side air for combustion, check that the outside air inlet is connected to draw fresh air from outside the
building.
2. All joints of PL vent and single wall stainless steel pipe should be fastened by at least 3 screws and
correctly installed. (Follow vent manufacturer’s instructions). Seal all joints with high temperature silicone
to create an airtight seal.
3. WARNING: The high temperature paint on this Multi-Fuel Insert may take several hours of burning at a
high fuel setting to cure fully. During this time, an odor that is not harmful may be evident. When odors are
present, the area around the Multi-Fuel Insert should be well ventilated.
4. Caution: The high temperature paint can be easily scratched prior to burning the Multi-Fuel Insert.
CAUTION
FAILURE TO FOLLOW THE INSTRUCTIONS IN THE INSTALLATIONS MANUAL MAY RESULT
IN A HOUSE FIRE. PLEASE FOLLOW INSTALLATION AND MAINTENANCE INSTRUCTIONS.
TABLE OF CONTENTS