OM600 ENGINE MECHANICAL 1B3-31
Assembly Procedure
Notice
In case the prechambers are reused, inspect the
prechambers thoroughly, if the ball pin by heat and fire is
broken, it can not be used.
1. Clean the sealing surface of the prechamber.
2. Insert the prechamber into the cylinder head at the same
time aligning the cam on the collar of the prechambers with
the slots in the cylinder head.
Notice
If the spacer rings are fitted to the prechambers, the spacer
rings should be replaced with rings of the same thickness.
Thickness of Spacer Ring
0.3, 0.6, 1.0 mm
3. Coat the threaded ring with oil and assemble the ring by
using the serration wrench.
Tightening Torque
130 Nm
Содержание OM600
Страница 12: ...1B3 12 OM600 ENGINE MECHANICAL MAINTENANCE AND REPAIR ON VEHICLE SERVICE ENGINE ASSEMBLY ...
Страница 26: ...1B3 26 OM600 ENGINE MECHANICAL POLY V BELT ALIGNMENT INSPECTION Without Air Conditioner With Air Conditioner ...
Страница 51: ...OM600 ENGINE MECHANICAL 1B3 51 49 Remove the cylinder head 2 and gasket 3 OM661LA ...
Страница 145: ...OM600 ENGINE MECHANICAL 1B3 145 CHAIN TENSIONER 1 Chain Tensioner 80Nm 2 Seal Replace ...
Страница 171: ...1B3 172 OM600ENGINE MECHANICAL Oil Circulation ...
Страница 172: ...OM600 ENGINE MECHANICAL 1B3 173 Oil Filter a From Oil Pump b To Main Oil Gallery c To Oil Pan ...