![SPX Viking Universal Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/spx/viking-universal/viking-universal_instruction-manual_1352689011.webp)
11
Original instructions
> English
• Never let sharp particles enter pump which can cut the diaphragm.
• Preventing from accidental loss of bilge-pump handle, rope and snap-hook should
always be connected at any location of handle.
• Capacity of this pump system is not intended to drain the craft in case of serious
damage at hull.
Winterization
• To avoid damages from freezing, drain pump and all pipe work from water.
• Never operate a frozen pump.
Maintenance
• Regular inspection of pump is recommended. Check the function of the pump.
• Regularly clear debris from pump inlet.
• At a clogged pump, remove the hose connections and operate the pump until it is free from
impurities.
• Rubber components should be replaced if worn or every three years.
Service kit no. 09-47545
Diaphragm, inlet- and outlet valves 2 pcs O-rings for ports,
For references, see fig. 6.
2 pcs split pins and 2 clips for ports.
Service kit no 09-47546
Handle and clips for handle.
For references, see fig. 6.
Changing diaphragm
For position reference see fig. 6.
• Loosen and remove the clamping ring screws, (pos 22 + 23).
• Remove clamping ring halves, (pos 13). Hoses may be left.
• Loosen and remove nut and washer in center of membrane plates, (pos 17+18).
• Remove lower membrane plate, (pos 3) and replace diaphragm, (pos 2).
• Reassemble in reversed order. Assure correct position of diaphragm before you tighten
center nut, torque 1,5 – 2 Nm, (pos 18). Check that diaphragm is “seated “ in cover and
body grooves, (pos 11+1).
• Distance between clamping ring halves 7,5 – 9 mm. See fig. 5.
Replacing valves
For position reference see fig. 6.
• Disconnect the Klick Tite connectors (pos 6, 8 or 24, 25) with hoses from the pump.
• Replace the valves (pos 7 and 9) in the ports. Be careful that each valve gets its proper
position. Be sure that correct valve is installed with the correct port.
• Flap valve (pos 9) is for inlet and tricuspid valve (pos 7) is for outlet.
• The text of the inlet valve (flap valve) should be turned against the diaphragm.
• Relocate the Klick Tite connectors.
• Lock the connectors with the clips (pos 10).
Waste management / Recycling
Dispose of the product in accordance with existing regulations.
Where appropriate, dismantle and sort the product by its material fractions.
Содержание Viking Universal
Страница 34: ...34 3 m 4 m Fig 2...
Страница 36: ...36 Fig 4 81 151 7 4x...
Страница 37: ...37 Fig 5 7 5 9 mm at both sides...
Страница 40: ...40...
Страница 41: ...41...
Страница 42: ...42...
Страница 43: ...43...