Test Mode
TABLE 4B

TOWER STATUS

VALVE POSITION

SOLENOID/TERMINALS

ENERGIZED

(light illuminated)

STEP

NUMBER

WHAT

OCCURS

MODE

PRESSURE

L

P/R

L

IN

R

P/R

R

IN

L

P/R

L

IN

R

P/R

R

IN

LT

RT

LT

RT

Start

D

D

LP

LP

C

O

C

O

1

R IN closes

D

-

LP

LP

C

O

C

C

E

2 (1)

R P/R opens

D

R

LP

<2

C

O

O

C

E

E

3

No change

D

R

LP

<2

C

O

O

C

E

E

4 (2) (3)

R P/R closes

D

-

LP

REP

C

O

C

C

E

5

R IN opens

D

D

LP

LP

C

O

C

O

6

L IN closes

-

D

LP

LP

C

C

C

O

E

7 (1)

L P/R opens

R

D

<2

LP

O

C

C

O

E

E

8

No change

R

D

<2

LP

O

C

C

O

E

E

9 (2) (3)

L P/R closes

-

D

REP

LP

C

C

C

O

E

NOTES:
(1)  Close purge rate valve during this step to check for any valve leaks.  No air should exhaust through the muffler.  If air is exhausting through the muffler, check all valves for leaks.  

After testing for leaks or fixing any leaks, be sure to open the purge pressure valve and reset the purge pressure.

(2)  Do not go to the next step until the tower is repressurized.
(3)  Switching failure alarm circuit is energized during this step (alarm light should flash until pressure exceeds 40 psig).

CODES:
R IN  - Right inlet valve 

D  - Drying 

E  - Energized

R P/R -  Right purge/repressurization valve 

R  -  Regenerating 

L IN  -  Left inlet valve 

LP  -  Line Pressure 

L P/R  -  Left purge/repressurization valve 

<2  -  Less than 2 psig 

LT  - Left tower 

REP - Repressurizing 

RT  - Right tower 

C  - Closed 

 

   

 

   

O  - Open

4.4  Test Mode

WARNING

Enclosure contains electricity.  

Use caution when working inside box. 
4.5.1  Test Mode - Standard Control Panel  
4.5.1.1
  Wait until point in cycle when right tower is drying and left 

tower has completed regeneration and repressurization (both 

towers at full line pressure).

4.5.1.2  De-energize dryer (on/off switch off, “O”); Select Test Mode by 

placing DIP switches 5 and 6 (found inside enclosure) in the ON 

(up) position; Re-energize dryer (1) (2).

4.5.1.3  Use Reset/step button to step through the operating cycle in the 

order shown in Table 4B.

4.5.1.4  Complete all 9 steps, allow the left tower to fully repressurize 

and de-energize dryer. (1) (3).

4.5.1.5  Reset DIP switches 5 and 6 to operating mode desired (10 min. 

cycle - 5 is OFF, 6 is ON or 4 min. cycle - 5 is ON, 6 is OFF); Re-

energize dryer. 

(1) Do not de-energize dryer unless both towers are at line pressure.

(2) If Test Mode is selected without de-energizing dryer, Test Mode light 

will blink until tower on line has completed drying. Dryer will then enter 

Test Mode and light will glow steadily.

(3) If another operating mode is selected without de-energizing dryer and 

before all 9 steps are completed, selected mode light will blink and dryer 

will automatically complete a cycle.  Dryer will then operate in selected 

mode and light will glow steadily. You may also use the Reset/step but-

ton to manually step through the cycle until the left tower drying light 

illuminates and pressing the Reset/step button will not advance through 

further steps.

Содержание RDH-HP Series

Страница 1: ...1550G RDH HP 5200G FOR M NO 3245430 R EVI S ION 04 2014 R EAD AN D U N D E R STAN D TH I S MAN UAL PR IOR TO OPE RATI NG OR S E RVICI NG TH I S PROD UCT I N STR UCTION MAN UAL MODELS RATED FLOW REFER...

Страница 2: ...red or replaced under warranty shall be warranted for the unexpired portion of the warranty applying to the original product The foregoing is the exclusive remedy of any buyer of the manufacturer s pr...

Страница 3: ...se Do not operate dryer without mufflers installed 5 High Velocity Air Do not stand near mufflers during tower depressurization I INSTALLATION 1 Install on level surface 2 Ambient temperature range 35...

Страница 4: ...arg are possible or reduce the moisture content of compressed air when used in critical process applications These dryers continuously dry compressed air by using two identical towers each containing...

Страница 5: ...sses through purge and repressurization valve 9B normally closed and purge muffler 10B to the atmosphere After regeneration purge and repressurization valve 9B normally open closes allowing tower 4B t...

Страница 6: ...r does not increase desiccant dryer capacity or reduce purge flow requirements However a cooling unit installed ahead of the desiccant dryer reduces the inlet air temperature and outlet air dew point...

Страница 7: ...ication Air Inlet Air Outlet Left Tower Pressure Gauge Right Tower Pressure Gauge Purge Pressure Gauge Electrical Entry Inlet Pressure Gauge Outlet Pressure Gauge Automatic Condensate Drain Purge Muff...

Страница 8: ...S 3 BOSS FITTING TOP VIEW ELECTRICAL ENCLOSURE SEE DETAIL SIDE VIEW SEE AC SIDE DETAIL RIGHT TOWER PRESSURE GAGE PURGE PRESSURE GAGE PURGE PRESSURE ADJUSTMENT VALVE DESICCANT FILL PORT FRONT VIEW LEFT...

Страница 9: ...PRESSURE GAUGE PURGE PRESSURE GAUGE RIGHT TOWER PRESSURE GAUGE ELECTRICAL ENCLOSURE NEMA CLASS 4 4X POWER SWITCH 3 PRONG MALE ELECTRICAL PLUG DETAIL A TOWER PRESSURE RELIEF VALVE PURGE MUFFLER PROCESS...

Страница 10: ...TLET SHUT OFF VALVE NPS 3 4 PLACES SEE SECTION B DESICCANT FILL PORT AIRLINE AFTERFILTER HF7 76 6F S MOUNTING HOLES 1 INCH DIA 6 PLACES PURGE MUFFLER 3 1 2 X 9 1 2 FORKLIFT OPENINGS 90mm X 241mm 2 PLA...

Страница 11: ...yer without one of the above measures Exhausting air will result in noise levels above OSHA permissible levels and exhausting gas could potentially cause harm to persons or property 2 8 Initial Desicc...

Страница 12: ...enoid Energized LED Left Purge Repressurization Solenoid Energize LED Right Purge Repressurization Solenoid Energized LED Left Inlet Solenoid Energized LED DIP Switches for Economizer Setting Standard...

Страница 13: ...various inlet temperatures NOTE During start up the indicator may be yellow however it should begin to change to green within four hours 3 2 1 3 Purge Flow Indicator Every four hours check the purge...

Страница 14: ...xcessive air is discharged through the muffler on the right check if valve 5b or 5c is sticking 3 3 Shut Down 3 3 1 Depressurize dryer 3 3 1 1 Open by pass valve if one is installed and close inlet an...

Страница 15: ...0 1 43 174 120 42 0 165 42 72 75 0 273 210 1 40 174 120 43 0 169 42 72 77 0 279 200 1 37 174 120 44 0 172 42 72 79 0 286 190 1 34 174 120 46 0 177 42 72 81 0 293 180 1 30 174 120 47 0 181 42 72 84 0 3...

Страница 16: ...r dryer operation Never use hygroscopic salts of the type com monly used in deliquescent type dryers 4 1 1 Frequency of desiccant replacement Desiccant should be replaced whenever the required dew poi...

Страница 17: ...4 Test Mode WARNING Enclosure contains electricity Use caution when working inside box 4 5 1 Test Mode Standard Control Panel 4 5 1 1 Wait until point in cycle when right tower is drying and left towe...

Страница 18: ...e correct Economizer Switch and Cycle Set tings Refer to Section 3 2 3 to verify proper time sequence 5 4 Tower fails to pressurize to line pressure Purge repressurization valve won t close Excessive...

Страница 19: ...011100 4011100 4011100 1 Purge Muffler Replacement Core 3097672 1 Purge Muffler Replacement Core 72378 72378 8 Aftercooler Air Filter Silencer Replacement Core 3211091 3211091 3211091 1 Aftercooler Te...

Страница 20: ...5200G SPX 1000 Philadelphia Street Canonsburg PA 15317 1700 U S A P 724 745 1555 F 724 745 6040 E hankison rental spx com www rentaldryers com Improvements and research are continuous at SPX Specifica...

Отзывы: