3
The Geareducer vent or vent line must be checked for blockage
to prevent failure of pinion shaft oil seal—clean when necessary.
Long-Term Storage or Downtime
indefinite duration
If unit has been in an operational state, perform a
Run Cycle
and drain the oil including volume in the oil line, if equipped. If in
storage, unit does not need to be operated.
Fabricate and install an overflow reservoir system and fill unit
entirely full of oil.
Maintenance Cycle
If unit is stored outdoors, drain condensate
monthly and top off oil as necessary. If unit is stored indoors,
but not climate controlled, maintenance cycle may be extended
to 3 months. If stored in climate controlled space, cycle may be
extended to once per year.
See
Marley User Manual Z0238848
“Cooling Tower Downtime
Instructions”
and
Marley Drawing Z0544916
“
Marley Geareducer
Reservoir System”
for further information.
Inspection Of Internal Parts
Remove the inspection cover plate from the side of the Geareducer
case at each oil change. Check inside of Geareducer for cleanliness
of case and internal parts. If any sludge is present, flush inside of
Geareducer and connecting oil line.
Also at this time, observe the contact pattern of the gear teeth to
see if they appear as illustrated in
Detail A
and
B
. If incorrect gear
tooth pattern should occur, refer to
Marley Field Repair Manual
for Series 32.2 Geareducer.
Repair and Overhaul
Geareducers can be repaired in the field, however, ma jor repairs
require the use of a fully equipped machine shop. If field repair or
overhaul is preferred, refer to Geareducer Parts Manual sheets for
parts required. Field repair instructions are available from Marley on
re quest. Contact the Marley sales office or Marley repre sentative
in your area for information.
operation and service
Figure 1
Priming Interstage Shaft
Check all gasketed joints for oil seepage. Tighten cap screws and
flange bolting if necessary.
The Geareducer must be installed level and properly aligned
with the driveshaft and motor shaft. Refer to the
Driveshaft
User Manual.
It is recommended to operate the Geareducer for no less than
30 minutes in any given run sequence. It is acceptable to ignore
this when “bumping” the motor for confirmation of the correct
direction of rotation.
Seasonal Shutdown
up to 4 months
At start
of shutdown period, perform a
Run Cycle
and change the
oil. See section on
Service and Lubrication.
Every 2 weeks
check the oil level and perform a
Run Cycle.
Once each month
drain any water condensation from the lowest
point of the Geareducer and its oil system. Check the oil level and
add oil if necessary. Perform a
Run Cycle.
To put back into operation
, drain water condensation from the
lowest point of the Geareducer and its oil system and check oil
level. Add oil if necessary.