background image

 

20 

 

 

Notice: 

 
 

Содержание Silentwind

Страница 1: ...instructions for use installation manual SILENTWIND...

Страница 2: ...ailability of electric energy without the possibility of grid connection is essential Fair winds at any time The Spreco Team Please note that this manual is part of the product and must be read closel...

Страница 3: ...nical data 7 3 3 Dimensions 7 3 4 Power diagram 8 4 List of enclosed parts 8 5 Operation description 9 6 Diameters of cables 9 7 Installation 9 8 Getting started 11 9 Run and stop 12 10 Charging indic...

Страница 4: ...d carbon fiber blades were successfully tested in a wind tunnel up to wind speeds of 35m s 63 knots according to DIN EN 61400 2 Therefor you need not worry about the Silentwind generator in any storm...

Страница 5: ...Never ever touch the open end of the wires The currents on charging the batteries can reach more than 30 A DC The whole wiring electric components and connection points must be able to carry a current...

Страница 6: ...C Rated power 400 Watt Rated peak power at 13 5 m s Start up speed 2 2 m s Start of charging 3 m s Charge indicator Blue LED on the buttom of housing 3 1 2 Mechanical date Safety test in wind tunnel 1...

Страница 7: ...ge 12 24 VDC Max input current windgenerator 30 A Max input current solar 10 A 100Wp LCD LED displays W V A kWh Ah load data 3 2 2 Mechanical data weight 1 15kg regulator Package dimensions 190x120x65...

Страница 8: ...parts All information is reliable The producer does not take any resonsibility for inaccuracies The user of both the instructions and the product takes any responsibility and any risk All specificatio...

Страница 9: ...equivalent of sonic velocity at the tips of the blades For every day use and safety reasons we have equipped the charge regulator with an additional electronic and manual stop switch 6 Diameters of c...

Страница 10: ...ice Once the mast is mounted you can start the relatively simple installation of the Silentwind generator First connect the 3 CF blades to the assembly hub see page 17 sketch 4 with the enclosed srews...

Страница 11: ...ntrolle Mast construction Optional check according to instruction especially all srew connections bracing vertical position Grounding and lightning protection according to local regulations Electric i...

Страница 12: ...ator A blue LED at the bottom of the body shows you when the charging process starts This depends on the state of charge of the battery normally 12 5 volt Attention If you operate the system with a 3...

Страница 13: ...bearings as to free movement bearing play and watertightness Deficient bearings must be replaced 11 4 Corrosion protection The complete housing is made of seaworthy alumine and additionally powder co...

Страница 14: ...th instruction Generator shaft sluggish Turn manually Connection windgenerator charge regulator short circuit of AC cables short circuit of generator customer service Windgenerator doesn t charge Poss...

Страница 15: ...iences Charge regulator wrongly installed Check in line with manual Correct installation Charge regulator stop switch is in position stop Switch stop switch in position RUN Observe manual instructions...

Страница 16: ...16 14 Attachment sketches sketch 1 sketch 2 sketch 3...

Страница 17: ...17 sketch 4 sketch 5 sketch 6 sketch 7...

Страница 18: ...18 sketch 8 sketch 9 sketch 10 sketch 11...

Страница 19: ...ill have to prove that the windgenerator has been mounted to an appropriate mast construction Damages caused by acts of nature beyond control Spreco Lda cannot be held responsible for especially light...

Страница 20: ...20 Notice...

Страница 21: ...rialnumber windgenerator Seriennummer Laderegler Serialnumber charge controller Verk ufer Firmenstempel Unterschrift Purchaser company stamp signature Kaufdatum date of purchase Die genauen Garantie B...

Отзывы:

Похожие инструкции для Silentwind