September 17, 2014
8
912-807 SAND & WATER PANEL
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__7)
Install the Acrylic Domes in Bubble Basin
To complete this
step you will need the two 12” acrylic domes with the drain
assemblies installed in the previous step. You will also need
sixteen 3/8” Flat Washer (12), sixteen 3/8” x 1 1/4” Button Head
Bolt (13), sixteen 3/8” T Nuts (14), and sixteen Rubber Washers
(16). Place the acrylic domes into the bubble basin (drain facing
the ground). Each bolt will need a 3/8 Flat Washer installed on it
first then a rubber washer and placed into the factory drilled hole
and secure it with the 3/8” T Nut on the bottom of the Bubble Basin
(see detail C) The 3/8” T Nut must be installed with the flat side
facing the ground. Do not use locktite on this step. (SEE DETAIL
C)
Содержание QUICK SHIP 1 MODIFIED
Страница 1: ...012 3 4 5 2 67 8 9 8 0 5 4 6 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...QUICK SHIP 1 MODIFIED Installation Guide...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 21: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 14 Installation Punch List Footing Layout Example...
Страница 28: ......
Страница 30: ......
Страница 31: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 22 COMPONENT INSTALLATION INSTRUCTIONS...
Страница 32: ......
Страница 35: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION...
Страница 42: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION...
Страница 50: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION...
Страница 64: ...September 17 2014 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION...
Страница 80: ...April 30 2014 6 912 275 PYRAMID ROOF INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK...
Страница 81: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX...
Страница 82: ......
Страница 87: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 6 ORIGINAL INSPECTION AND MAINTENANCE FORMS...
Страница 88: ......
Страница 111: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 8 COMPLETED INSPECTION AND MAINTENANCE FORMS...
Страница 112: ......