March 19, 2014
5
922-116-3 (3’) VERTICAL CLIMBER/PROTECTIVE BARRIER
INSTALLATION INSTRUCTION
INSTALLATION STEPS CONTINUED
__5)
Connect Four-Hole brackets to posts:
Now you need to
install the Four-Hole Brackets to the posts. The top of the barrier,
NOT THE ARCH, should be 38” from the top of the surface of the
deck to the top of the barrier. Once you have the top of the barrier
at the correct height tighten the two 3/8”x1” Button Head bolts (6).
The Four-Hole Brackets get installed with the Self-Tapping Screws
(4) and Attachment Bracket Gaskets (5) make sure that the hole for
the 3/8x 3/8” set screw is pointing down.
TIP: It’s easier to
install the self-tapping screws if you pre drill the holes in the
post with a #7 drill bit by marking the hole locations with a dry
erase marker after you have put the guard wall into position.
Install the Self-Tapping Screws into the holes you have drilled in
the posts with the Attachment Bracket Gasket between the post and
Four- Hole Attachment Bracket. (See detail C) Repeat this
procedure for the Four Hole Attachment Brackets that hold on the
Rung Ladder. The measurement for the bottom of the Rung Ladder
is not critical.
__6)
Secure the Vertical Climber/Protective Barrier to the
Attachment Brackets:
Install and tighten the
3/8x3/8” Set Screw
(5) in the Four-Hole Bracket. (See detail C)
__7)
Tighten all Hardware:
__8)
Inspect the components:
for sharp edges and if necessary file
them down and apply touch up paint.
Содержание QUICK SHIP 1 MODIFIED
Страница 1: ...012 3 4 5 2 67 8 9 8 0 5 4 6 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...QUICK SHIP 1 MODIFIED Installation Guide...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 21: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 14 Installation Punch List Footing Layout Example...
Страница 28: ......
Страница 30: ......
Страница 31: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 22 COMPONENT INSTALLATION INSTRUCTIONS...
Страница 32: ......
Страница 35: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION...
Страница 42: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION...
Страница 50: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION...
Страница 64: ...September 17 2014 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION...
Страница 80: ...April 30 2014 6 912 275 PYRAMID ROOF INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK...
Страница 81: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX...
Страница 82: ......
Страница 87: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 6 ORIGINAL INSPECTION AND MAINTENANCE FORMS...
Страница 88: ......
Страница 111: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 8 COMPLETED INSPECTION AND MAINTENANCE FORMS...
Страница 112: ......