Value Series
Installation Guide
2/28/11 V-C_OUTLINE.V1.0211
21
SUPERVISION GUIDE
Although the equipment is designed, installed and maintained in accordance with
all safety guidelines adult supervision is required.
Not all equipment is appropriate for all ages. Direct children to age appropriate
equipment.
Younger children will require more supervision than older children.
While eliminating accidents is not likely, following these guidelines will help
minimize accidents.
Basic playground safety for supervisors:
!
Make sure all safety surfacing is in place and at the correct height.
Inspect area for hard or sharp objects and remove them.
!
No dangerous horseplay in the play area. (Jumping from dangerous
heights, displacing of surfacing, etc…)
!
Inspecting for missing or broken equipment. (Do not allow children to
play on broken equipment or equipment with missing components).
!
Make sure there are no unsafe modifications (especially ropes tied to
equipment). Remove all unsafe modifications and close the equipment
for play until they are removed.
!
Keep children in the designated play area.
!
Do not let children play on wet equipment.
!
Prevent overcrowding on play equipment.
!
Loose clothing, hoods, strings or jewelry shall be tight or not worn
while playing to prevent strangulation.
!
Ensure the temperature of the equipment is not hazardous. Direct
sunlight exposure can increase the temperature of the equipment high
enough to cause injury.
!
Inspect the playground every day using the General Inspection Checklist
located in the appendix of this manual
o
The easiest method for performing the daily inspection with the
checklist is to laminate the checklist and use a dry erase marker
to mark the items off before opening the play area
Содержание QUICK SHIP 1 MODIFIED
Страница 1: ...012 3 4 5 2 67 8 9 8 0 5 4 6 72 2ABCDB EBCF GHB BIGJEB KCILCA MBNOEB MBPJIIJIP JIDGCAACGJOI...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 7: ...QUICK SHIP 1 MODIFIED Installation Guide...
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 21: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 14 Installation Punch List Footing Layout Example...
Страница 28: ......
Страница 30: ......
Страница 31: ...Value Series Installation Guide 2 28 11 V C_OUTLINE V1 0211 22 COMPONENT INSTALLATION INSTRUCTIONS...
Страница 32: ......
Страница 35: ...March 10 2014 3 912 242 SQUARE DECK 46 INSTALLATION INSTRUCTION...
Страница 42: ...March 10 2014 4 922 126 3 3 TRIPLE RAIL SLIDE INSTALLATION INSTRUCTION...
Страница 50: ...March 11 2014 4 922 120 3 CORKSCREW 3 DECK INSTALLATION INSTRUCTION...
Страница 64: ...September 17 2014 4 912 807 SAND WATER PANEL INSTALLATION INSTRUCTION...
Страница 80: ...April 30 2014 6 912 275 PYRAMID ROOF INSTALLATION INSTRUCTION THIS PAGE WAS INTENTIONALLY LEFT BLANK...
Страница 81: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 1 INSTALLATION APPENDIX...
Страница 82: ......
Страница 87: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 6 ORIGINAL INSPECTION AND MAINTENANCE FORMS...
Страница 88: ......
Страница 111: ...VALUE SERIES INSTALLATION APPENDIX 4 2 10 M C_APPENDIX V1 0410 8 COMPLETED INSPECTION AND MAINTENANCE FORMS...
Страница 112: ......