IM-IBR16-32IN
Issue 1
13
Fig. 4 Strainer screen
8
11
7
9
A.
Install bolts hand tight then "snug-up" to 15 N m to 30 N m but not to exceed 20%
of the target torque. Check flange gap for uniformity.
B.
Tighten to 20% to 30% of target torque. Check flange gap for uniformity.
C.
Tighten to 50% to 70% of target torque. Check flange gap for uniformity.
D.
Tighten to 100% of target torque. Check flange gap for uniformity.
E.
Continue to tighten the bolts on a rotational clockwise pattern until no further rotation
occurs at the target torque.
Sequence
Recommend target torque for strainer flange
N m
lbf ft
A
10 - 16
7 - 12
B
16 - 24
12 - 18
C
40 - 56
29 - 41
D
80
59
E
80
59
1
3
2
4
Fig. 5 Recommended bolting sequence (1-3-2-4) and torque
Содержание FTC80
Страница 2: ...IM IBR16 32IN Issue 1 2 ...
Страница 21: ...IM IBR16 32IN Issue 1 21 5 15 Air vent bleed screw 12 Fig 12 18b 11 27 ...
Страница 24: ...IM IBR16 32IN Issue 1 24 ...