57 Operations Manual
–
Wall Extruder (Frame Nailer Gen IV and Tables)
11.2
Replacing Guide Trolley Slides
Figure 21, Trolley slide replacement
Tools required
: Set of Allan keys
•
Disconnect power.
•
Disconnect lead and remove home sensor.
•
Disconnect leads from and remove motor.
•
Undo 16 cap screws holding fence assy.
•
Turn upside down, and release belt tension. (Grub screw in centre of tensioner)
•
Remove tensioners, (outside screws.)
•
Undo pulley blocks from each end, grub screw top and bottom.
•
Slide trolley out at one end.
•
Undo grub screws either side of slides, remove, replace.
•
Blow out the aluminium extrusion, and pulley blocks.
•
Reassemble, tension belt (put most tension at the front, leaving adjustment at rear if more
tension is needed later.
•
Bolt fence back up.
•
Fit motor and leads.
•
Fit home sensor and lead.
•
Start up, enable home trolley.
•
Check home position is correct, if not alter in set up screen.
•
Reset enable home trolley.
•
Send out to 6 mtrs, and check.
•
If incorrect recalibrate trolley as normal.
Содержание Wall Extruder
Страница 1: ...OPERATION MAINTENANCE MANUAL ...
Страница 68: ...67 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 25 Electrical Drawings Part 2 ...
Страница 69: ...68 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 26 Electrical Drawings Part 3 ...
Страница 70: ...69 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 27 Electrical Drawings Part 4 ...
Страница 71: ...70 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 28 Electrical Drawings Part 5 ...
Страница 72: ...71 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 29 Electrical Drawings Part 6 ...