10 Operations Manual
–
Wall Extruder (Frame Nailer Gen IV and Tables)
Check all pneumatic hoses and connectors to ensure that the fittings haven’t
worked loose during
transportation of the machine. Re-tighten all fittings that appear to be leaking. If leaking persists
undo the fittings and apply a sealing compound to the joints in question. Re-tighten the fitting. (Any
serious leaking problems during the warranty period should be reported to Spida Machinery). Check
the air pressure in the system is sufficient to operate the machine (refer to 4 Specifications for
pressure settings).
To check the air pressure, turn the compressor on and allow the pressure to build up. When the
controls are activated, normal pressure should read 6-8 bar or 600- 800 kPa. All maximum pressures
are factory set and should not be changed.
Check that all safety equipment is functioning properly.
Содержание Wall Extruder
Страница 1: ...OPERATION MAINTENANCE MANUAL ...
Страница 68: ...67 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 25 Electrical Drawings Part 2 ...
Страница 69: ...68 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 26 Electrical Drawings Part 3 ...
Страница 70: ...69 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 27 Electrical Drawings Part 4 ...
Страница 71: ...70 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 28 Electrical Drawings Part 5 ...
Страница 72: ...71 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 29 Electrical Drawings Part 6 ...