Noise control
The normal operation noise of some machines will be more than permitted noise exposure levels.
Employers must ensure adequate hearing protection is available and is used by all persons in the
affected area.
6.11
Manual Handling
Manual handling should be avoided where possible, use of mechanical lifting and assisting
equipment is recommended. Consider using forklifts, hoists, and trolleys to eliminate lifting and
carrying components.
6.12
Recommended Service Interval
It is recommended that for optimal performance, the Wall Extruder should be serviced every 6
months.
It is also recommended that a service log be kept, as a reminder of when the next service should be
due. Spida Machinery performs service runs on a regular basis throughout NZ; however, should the
need arise for an early service, or should a service need to be booked in advance, please advise
Spida Machinery accordingly.
WARNING!
Do not operate the Wall Extruder without having received the
proper instruction in operation and safety from this manual.
WARNING!
It is recommended that the employers maintain training records
demonstrating the competencies of each employee
Содержание Wall Extruder
Страница 1: ...OPERATION MAINTENANCE MANUAL ...
Страница 68: ...67 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 25 Electrical Drawings Part 2 ...
Страница 69: ...68 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 26 Electrical Drawings Part 3 ...
Страница 70: ...69 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 27 Electrical Drawings Part 4 ...
Страница 71: ...70 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 28 Electrical Drawings Part 5 ...
Страница 72: ...71 Operations Manual Wall Extruder Frame Nailer Gen IV and Tables Figure 29 Electrical Drawings Part 6 ...