7
STEP
5
Install RO Tap (continued)
IINSTALL REVERSE OSMOSIS TAP
5
Locate and organize your RO Tap install parts. See packing list on page 1
6
Route the 3 tubes
R
,
S
,
T
attached to the RO Tap Body
P
through the RO Tap Base
Q
, but don’t connect the
RO Tap Body
P
to the RO Tap Base
Q
yet. Then route the 3 tubes
R
,
S
,
T
through the hole in the sink until 12” of
tubing remains above the sink. Lay RO Tap Body
P
on the counter top.
7
Mount Tap Body
P
to the sink hole by pushing the toggle bolts through the hole until the RO Tap Body
P
is flat against the sink
surface. Position the toggle bolts to catch under the lower surface of the sink or counter, but ensure that they will not obstruct
the tap stem from sitting in place. Loosely tighten the toggle bolts until the RO Tap Base
Q
is mounted loosely to the surface.
TIP: Make sure to keep the “wings” of the toggle bolts free to allow all tubing and tap stem room
TIP: Install the tap base with the bolts at 5 and 11 o’clock positions to have the handle positioned at 90 degrees to the right
8
Hold the RO Tap Base
Q
firmly and mount the RO Tap Body
P
to the RO Tap Base
Q
by turning 1/4 clockwise to lock. Ensure
the RO Tap Body Handle is positioned to your liking.
TIP: If there is not enough clearance for the tubing and the stem, the toggle wings may need to be adjusted to create more
clearance.
9
Turn the RO Tap Body
P
1/4 turn counter-clockwise and remove the tap enough to tighten the RO Tap Base
Q
toggle bolt
screws firmly. Do not over-tighten.
1 0
Mount the RO Tap Body
P
to the RO Tap Base
Q
and turn 1/4 turn clockwise until it locks.
1 1
Mount the RO Tap Spout
O
to the RO Tap Body
P
by screwing spout nut to body.
5
O
P
S
R
T
Q