![Speck pumpen BADU Eco Touch-pro Скачать руководство пользователя страница 94](http://html.mh-extra.com/html/speck-pumpen/badu-eco-touch-pro/badu-eco-touch-pro_manual_1341796094.webp)
5 Installation
42
EN VG
766.2000.055
06/2014
5.3 Installation
The pump can installed either below the water level with a gravity feed
or above it in suction operation.
W90.80.020
A
B
(1)
A Installation above
water level = suction operation
B Installation below
water level = gravity feed
(1) Foot valve is necessary for
non self-priming pumps
In suction feed, the suction height is significantly reduced by flow
resistance in the suction line or pipes which are too low or have
diameters too narrow.
5.3.1
Installing the pump and connecting it to the pipe
1. Install the pump in a horizontal and dry position. When doing so,
pay attention to the maximum distance to the water level, geodetic
height. See pump data sheet.
The motor can be damaged due to insufficient drainage!
Î
Do not block or seal the small opening between the pump housing
and the motor.
Содержание BADU Eco Touch-pro
Страница 50: ...50 VG 766 2150 069 04 2014 ...
Страница 51: ...04 2014 VG 766 2150 069 51 ...
Страница 140: ...2 Veiligheid 88 NL VG 766 2000 055 06 2014 2 9 8 Vorstgevaar Î Pomp en vorstgevoelige leidingen op tijd legen ...
Страница 203: ...06 2014 VG 766 2000 055 151 ...
Страница 204: ...VG 766 2000 055 75 KR BA 06 2014 ...