5.2 Pipes
5.2.1 Pipe
sizing
Suction lines which are too long have significant disadvantages:
y
Higher resistance which results in less efficient priming and a higher
risk of cavitation.
y
Longer priming time, up to 12 min.
The dimensions which are specified in the pump data sheet apply only
to a pipe length of max. 5 m.
For longer pipes, losses due to pipe friction must be taken into account.
Î
Size pipes according to the data in the tables. See pump data
sheet.
5.2.2 Laying
pipes
Î
Keep the suction line as short and straight as possible.
Î
Avoid sudden changes to the cross-section and direction.
Î
If possible, lay the suction line below the water level.
Î
Lay the suction line as follows to prevent air pockets from forming:
– For gravity feed: continuously falling.
– For suction operation: continuously rising but below water level.
Î
If the pump is installed above the water level, install a foot valve in
the suction line. Required for non self-priming pumps,
recommended for self-priming pumps. With it, the suction line
cannot drain when the pump isn't working, and the priming time
stays short, e.g. after cleaning the basket.
Î
If clogging is possible e.g. with straw or grass, install a filter in the
intake or the suction line.
Î
Depending on the type of pump and system, install a non-return
valve as necessary.
Î
Install valves in both the suction and pressure line.
Î
Avoid valves which close suddenly. Install shock absorber or air
vessel if necessary.
Note: If the suction line leaks, the pump will prime poorly or not at all.
Î
Ensure the suction line does not leak and make sure that the cover
is screwed on tightly.
Содержание BADU Eco Touch-pro
Страница 50: ...50 VG 766 2150 069 04 2014 ...
Страница 51: ...04 2014 VG 766 2150 069 51 ...
Страница 140: ...2 Veiligheid 88 NL VG 766 2000 055 06 2014 2 9 8 Vorstgevaar Î Pomp en vorstgevoelige leidingen op tijd legen ...
Страница 203: ...06 2014 VG 766 2000 055 151 ...
Страница 204: ...VG 766 2000 055 75 KR BA 06 2014 ...