8999071EN: v1.410/10/2019
22
Original instructions (ENGLISH)
Website: www.spearheadmachinery.com
Figure 34
Figure 35
Figure 36
Figure 37
Figure 38
Figure 39
Figure 40
Figure 41
8.5
Plan For Maintenance Jobs
After first two hours of work always:
8.5.1.1
Check the belt tension
Check if all bolts and taper locks are tightened enough
Do the same also after each belt changing.