Page 4
Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com
C
D
SEE-SAW ASSEMBLY
BASE ASSEMBLY
Step 1:
Cut 2 rails to 55mm. Insert 1 rail into
each hole on the See-Saw.
Step 2:
Insert the See-Saw Arm and the rails into
the Rail Clip. You may need to adjust the See-Saw
after installing it as it may have shifted.
Step 3:
Insert See-Saw into Arm Holder B.
Step 4:
Insert the See-Saw into the Rail Stand
(300mm Shaft). See shaft assembly on page 8
for exact placement.
See-Saw Arm
Rail Clip
55mm rail pieces
Step 1:
Interlock Base block tabs
as shown below.
Step 2:
Press Base Holder A and
Base Holder B pieces into the Base
blocks for a more secure hold.
1
2
2
NOTE:
Base Holder B is used
here instead of A.