Space-Ray SRP 08 Скачать руководство пользователя страница 23

Page 21 of 24

7.14.4 When assembling a replacement reverberatory screen, ensure that it is positioned on the cross support, at the

controls end to prevent shorting of the flame sensor.

7.15

Emitter Assembly

7.15.1 Having disconnected the electrical and gas supplies from the appliance and lowered the appliance to the

ground, (see sections 6.7.3 and 6.7.4) place the appliance on a work bench and carry out the following
instructions.

7.15.2 Disconnect the grey flame sensor lead from the flame probe by gently pulling the connector, using pliers.

7.15.3 Disconnect the black HT ignition lead from the ignition spark electrode by gently pulling the plastic 

shroud from the Raja connector of the electrode.

7.15.4 Remove the screws securing the reflector assembly to the flue collar panels and remove the reflector 

assembly.

7.15.5 Place the appliance with the emitter surface facing upwards.  Remove the M4 screws securing the flue collar

panels to the plenum body and remove the flue collar panels.  Care should be taken to avoid damage to the
spark electrode and flame probe.

7.15.6 Slide out the reverberatory screen.

7.15.7 Remove the 1/4" UNC nuts and setscrews retaining the emitter assembly and reverberatory screen side  rails

and end baffles to the plenum body.  Lift off the reverberatory screen side rails and end baffles and carefully lift
our the emitter assembly.

7.15.8 Clean off any ceramic paper gasket material from the plenum body flanges and emitter assembly.

7.15.9 When assembling a replacement emitter assembly, new ceramic paper gasket material must be used to 

provide a complete seal between the plenum body flanges and the emitter assembly.

7.16

Replacement Parts List

The following is a list of replacement parts that may be required during the life of the appliance.

Part

Part Number

Part

Part Number

Pilot Frame

1790

Control Valve (Spark)-Honeywell 4262240

Thermopile

1801

Control Valve (Spark)-S.I.T

4262585

Pilot Injector (LPG)

1901

Control Valve (Pilot)

4262241

Pilot Injector (NG)

1902

Emitter Assy SRP08

4262306

Pilot Reverb. Screen SRP08

4250567

Emitter Assy SRP15

4262307

Pilot Reverb. Screen SRP15

4250568

Emitter Assy SRP22

4262308

Pilot Reverb. screen SRP22

4250569

Emitter Assy SRP30

4262309

Reverb. Screen SRP08

4250589

Venturi Gasket

4262420

Reverb. Screen SRP15

4250590

Ceramic Paper Gasket

4262421

Reverb. Screen SRP22

4250591

Thermocouple

4262

Reverb. Screen SRP30 

4250592

1/4" UNC Hex Nut s/s

4267925

Ignition Control (Honeywell)

4262196

1/4" UNC x 5/8" Setscrew S/S

4267926

Ignition Control (S.I.T.)

4262535

Spark Electrode

4262205

Flame Sensor

4262206

8.

Operating Instructions

8.1

Direct Burner Spark Ignition Models

.

8.1.1

Turn on the gas supply to the appliance.

8.1.2

Set any time switch or thermostats to demand heat.

8.1.3

Switch on the electrical supply to the appliance.

8.1.4

The burner should ignite within 25 seconds (Honeywell Control) or 10 seconds (S.I.T Control).

Содержание SRP 08

Страница 1: ...AND OPERATING INSTRUCTIONS SRP DBI SRP PILOT SERIES MODELS SRP 08 SRP15 SRP 22 SRP30 SRP 30 Hi Lo Gas Fired Products UK Ltd Chapel Lane Claydon Ipswich Suffolk IP6 0JL England Tel 01473 830551 Fax 014...

Страница 2: ......

Страница 3: ...2 4 Flame Supervision 15 6 Servicing 15 17 6 1 Ignition Electrode 15 6 2 Flame Sensor Probe 16 6 3 Venturi Fabrication 16 6 4 Injector 16 6 5 Electrical Wiring 16 6 6 Reflector 16 6 7 Emitter Assembl...

Страница 4: ...kW Hs 13 68kW Hi 15 0kW Hs 13 5kW Hi Appliance Type A1 A1 Appliance Cat I2H I3 Adjusted for 2H G20 20mbar 3 G30 G31 29 37mbar Setting Pressure 12 0mbar None Injector 3 1mm 1 9mm Pre Injector None None...

Страница 5: ...W 0 435m H 0 325 Weight 24 0kg Reflector Parabolic Dimensions L 1 475m W 0 540m H 0 550m Weight 28kG Table 5 MODEL SRP30 Hi Lo N SRP30 Hi Lo L Heat Input 30 4kW 15 2kW Hs 30 0kW 15 0kW Hs Appliance Ty...

Страница 6: ...Hs 13 68kW Hi 15 0kW Hs 13 5kW Hi Appliance Type A1 A1 Appliance Cat I2H I3P Adjusted for 2H G20 20mbar 3P G31 37mbar Setting Pressure 12 0mbar 24 0mbar Injector 3 1mm 2 1mm Pilot Injector TJ020 TJ01...

Страница 7: ...pliance plenum body by use of M8 screws and nuts Providing at least 5mm closed link hooks are used chains may be attached directly to the 4 holes in the appliance plenum body 3 1 3 The appliance must...

Страница 8: ...12 5mbar Gas Connection Rc 3 2 1 1 Installation pipes should be fitted in accordance with National and Local Regulations Pipes of a smaller size than the appliance connection Rc should not be used and...

Страница 9: ...LOT IGNITION MUST NOT BE CONNECTED TO ANY ELECTRICAL SUPPLY 3 3 1 Direct Burner Spark Ignition the electrical wiring to the appliance must be installed in accordance with the latest or current Nationa...

Страница 10: ...l fault after installation of the appliance preliminary system checks are required to be carried out i e earth continuity polarity and resistance to earth 3 3 4 Internal Wiring Diagram Honeywell Contr...

Страница 11: ...BR 7 3 2 G Y BK 7 2 3 L1 7 N L2 BR G Y BL CONTROL VALVE WIRING COLOUR CODES BY PASS VALVE Hi Lo OPERATION 12 11 10 9 8 7 6 5 4 3 2 1 1 3 7 2 1 7 2 3 L1 N 7 7 6 7 WIRING COLOUR CODES BK BLACK BL BLUE B...

Страница 12: ...r kW of operating heat input are ventilated out of the installation room The air products of combustion mixture must be evacuated above the radiant heaters if possible near the ridge by means of exhau...

Страница 13: ...atural air change greater than 1 5 volumes per hour Buildings with a density of operating heat input not greater than 5W m 3 4 1 4 Air Supply Air supply openings are required to admit air and shall be...

Страница 14: ...Yellow to terminal marked 7 External fuse required 3 amp See Section 3 3 for electrical supply requirements 4 3 SRP08 SRP15 SRP22 Standing Pilot Ignition 4 3 1 The appliance should be raised and suspe...

Страница 15: ...r a period of 10 seconds to reset the ignition control If a first reset is not successful wait at least 15 seconds before repeating the procedure After reset an extended waiting time will occur 5 1 1...

Страница 16: ...vernor of the control valve Adjust the pressure using a suitable screwdriver by turning the pressure governor adjusting screw clockwise to increase or anti clockwise to decrease the burner setting pre...

Страница 17: ...F position and turn off the gas supply at the gas isolation valve NOTE concise operating instructions are contained on Instruction Label 4260461 that should be affixed adjacent to a low level user con...

Страница 18: ...pliance burner flame is extinguished within 60 seconds 5 2 4 2 Re connect the thermocouple and re ignite the appliance burner by following the procedure in section 5 2 1 of these commissioning instruc...

Страница 19: ...box first slacken the gland nut 2 gland nuts on SRP30 Hi Lo located in the junction box below the control valve then unscrew the four screws securing the cover of the junction box Carefully lift away...

Страница 20: ...le and Commission 6 10 1 Re assemble the appliance in reverse order and commission in accordance with the instructions contained in section 5 6 11 Auxiliary Controls 6 11 1 Room thermostats time switc...

Страница 21: ...in a vice 7 7 Venturi Fabrication 7 7 1 First unscrew the four M4 screws securing the elbow flange connector to the control valve outlet port and remove the control valve assembly complete 7 7 2 Unscr...

Страница 22: ...elease the spring latch securing the thermopile in the pilot frame and pull the thermopile from the bottom of the pilot frame 7 11 3 When fitting a replacement thermopile ensure that the electrical le...

Страница 23: ...r the emitter assembly 7 15 8 Clean off any ceramic paper gasket material from the plenum body flanges and emitter assembly 7 15 9 When assembling a replacement emitter assembly new ceramic paper gask...

Страница 24: ...lockwise to the OFF position and wait 5minutes thus allowing any gases to escape which may have accumulated in the combustion chamber 8 2 3 Press slightly and turn the control knob counter clockwise t...

Страница 25: ...Page 23 of 24 NOTES...

Страница 26: ...Page 24 of 24 07 05 GB IE ES PT 484S...

Отзывы: