3.4 Ventilation

The installation room should have a volume of at least 10m

³

/kw of installed nominal heat input of the radiant

heater.

The ventilation requirements and calculation methods for unflued appliances are set out in the European
Standards 

EN 13410:2001 

and must be applied. The following is guidance to the standard:

Ventilation may be achieved by any of the three following different means:

a)  thermal evacuation of the products of combustion/air mixture
b)  mechanical evacuation of the products of combustion/air mixture
c) natural 

air 

change

3.4.1.1  Ventilation by Thermal Evacuation

Ventilation by thermal evacuation is sufficient if 

10m

³

/h of exhaust air per kW of operating heat input 

are

ventilated out of the installation room.

The air/products of combustion mixture must be evacuated above the radiant heaters, if possible near the ridge,
by means of exhaust mixture opening(s), (vents).

Where the exhaust mixture opening(s) can be closed, it shall only possible to operate the radiant heaters when
they are open.

The maximum horizontal distance between a radiant heater and a vent opening shall be:

6 (six) times the vent height in the case of 

wall 

openings

3 (three) times the vent height in the case of 

roof 

openings

G/Y

TERMINAL BLOCK

2

1

7

GR = GREY

7

7

G/Y

BL (HT)

6

GR

G/Y

BL

BR

G/Y = GREEN & YELLOW

WIRING COLOUR CODES

BR = BROWN

BL = BLUE

BK = BLACK

12 WAY 0.2 PITCH
KK CONNECTOR
4262107

S.I.T. (0.537.008) IGNITION CONTROL - 4262535

SRP 30 Hi/Lo

10

11

12

6

7

9

8

4

5

3

2

1

L1

BL

G/Y

BR

BY-PASS VALVE

(SRP 30 Hi/Lo)

BK

3

3

4 PIN BASE PLUG

L2

N

7

BL

2

1

BR

7

Содержание SRP 08

Страница 1: ...AND OPERATING INSTRUCTIONS SRP DBI SRP PILOT SERIES MODELS SRP 08 SRP15 SRP 22 SRP30 SRP 30 Hi Lo Gas Fired Products UK Ltd Chapel Lane Claydon Ipswich Suffolk IP6 0JL England Tel 01473 830551 Fax 014...

Страница 2: ......

Страница 3: ...2 4 Flame Supervision 15 6 Servicing 15 17 6 1 Ignition Electrode 15 6 2 Flame Sensor Probe 16 6 3 Venturi Fabrication 16 6 4 Injector 16 6 5 Electrical Wiring 16 6 6 Reflector 16 6 7 Emitter Assembl...

Страница 4: ...kW Hs 13 68kW Hi 15 0kW Hs 13 5kW Hi Appliance Type A1 A1 Appliance Cat I2H I3 Adjusted for 2H G20 20mbar 3 G30 G31 29 37mbar Setting Pressure 12 0mbar None Injector 3 1mm 1 9mm Pre Injector None None...

Страница 5: ...W 0 435m H 0 325 Weight 24 0kg Reflector Parabolic Dimensions L 1 475m W 0 540m H 0 550m Weight 28kG Table 5 MODEL SRP30 Hi Lo N SRP30 Hi Lo L Heat Input 30 4kW 15 2kW Hs 30 0kW 15 0kW Hs Appliance Ty...

Страница 6: ...Hs 13 68kW Hi 15 0kW Hs 13 5kW Hi Appliance Type A1 A1 Appliance Cat I2H I3P Adjusted for 2H G20 20mbar 3P G31 37mbar Setting Pressure 12 0mbar 24 0mbar Injector 3 1mm 2 1mm Pilot Injector TJ020 TJ01...

Страница 7: ...pliance plenum body by use of M8 screws and nuts Providing at least 5mm closed link hooks are used chains may be attached directly to the 4 holes in the appliance plenum body 3 1 3 The appliance must...

Страница 8: ...12 5mbar Gas Connection Rc 3 2 1 1 Installation pipes should be fitted in accordance with National and Local Regulations Pipes of a smaller size than the appliance connection Rc should not be used and...

Страница 9: ...LOT IGNITION MUST NOT BE CONNECTED TO ANY ELECTRICAL SUPPLY 3 3 1 Direct Burner Spark Ignition the electrical wiring to the appliance must be installed in accordance with the latest or current Nationa...

Страница 10: ...l fault after installation of the appliance preliminary system checks are required to be carried out i e earth continuity polarity and resistance to earth 3 3 4 Internal Wiring Diagram Honeywell Contr...

Страница 11: ...BR 7 3 2 G Y BK 7 2 3 L1 7 N L2 BR G Y BL CONTROL VALVE WIRING COLOUR CODES BY PASS VALVE Hi Lo OPERATION 12 11 10 9 8 7 6 5 4 3 2 1 1 3 7 2 1 7 2 3 L1 N 7 7 6 7 WIRING COLOUR CODES BK BLACK BL BLUE B...

Страница 12: ...r kW of operating heat input are ventilated out of the installation room The air products of combustion mixture must be evacuated above the radiant heaters if possible near the ridge by means of exhau...

Страница 13: ...atural air change greater than 1 5 volumes per hour Buildings with a density of operating heat input not greater than 5W m 3 4 1 4 Air Supply Air supply openings are required to admit air and shall be...

Страница 14: ...Yellow to terminal marked 7 External fuse required 3 amp See Section 3 3 for electrical supply requirements 4 3 SRP08 SRP15 SRP22 Standing Pilot Ignition 4 3 1 The appliance should be raised and suspe...

Страница 15: ...r a period of 10 seconds to reset the ignition control If a first reset is not successful wait at least 15 seconds before repeating the procedure After reset an extended waiting time will occur 5 1 1...

Страница 16: ...vernor of the control valve Adjust the pressure using a suitable screwdriver by turning the pressure governor adjusting screw clockwise to increase or anti clockwise to decrease the burner setting pre...

Страница 17: ...F position and turn off the gas supply at the gas isolation valve NOTE concise operating instructions are contained on Instruction Label 4260461 that should be affixed adjacent to a low level user con...

Страница 18: ...pliance burner flame is extinguished within 60 seconds 5 2 4 2 Re connect the thermocouple and re ignite the appliance burner by following the procedure in section 5 2 1 of these commissioning instruc...

Страница 19: ...box first slacken the gland nut 2 gland nuts on SRP30 Hi Lo located in the junction box below the control valve then unscrew the four screws securing the cover of the junction box Carefully lift away...

Страница 20: ...le and Commission 6 10 1 Re assemble the appliance in reverse order and commission in accordance with the instructions contained in section 5 6 11 Auxiliary Controls 6 11 1 Room thermostats time switc...

Страница 21: ...in a vice 7 7 Venturi Fabrication 7 7 1 First unscrew the four M4 screws securing the elbow flange connector to the control valve outlet port and remove the control valve assembly complete 7 7 2 Unscr...

Страница 22: ...elease the spring latch securing the thermopile in the pilot frame and pull the thermopile from the bottom of the pilot frame 7 11 3 When fitting a replacement thermopile ensure that the electrical le...

Страница 23: ...r the emitter assembly 7 15 8 Clean off any ceramic paper gasket material from the plenum body flanges and emitter assembly 7 15 9 When assembling a replacement emitter assembly new ceramic paper gask...

Страница 24: ...lockwise to the OFF position and wait 5minutes thus allowing any gases to escape which may have accumulated in the combustion chamber 8 2 3 Press slightly and turn the control knob counter clockwise t...

Страница 25: ...Page 23 of 24 NOTES...

Страница 26: ...Page 24 of 24 07 05 GB IE ES PT 484S...

Отзывы: