
Form 43343120
July 2021
-45-
Note: When the PGR is operated by a thermostat interrupting the line voltage (120V) to the heater then the post
purge function is disabled.
If the flame is not sensed during sequence T3 then the burner will automatically begin re-ignition sequence T2.
The ignition sequence will be repeated three times with a 60 second inter-purge. If the flame is not re-
established the heater will go to lockout.
19.1) SEQUENCE OF OPERATION
–
TWO STAGE (N7/L7)
The chart below shows the sequence of operation for the normal operating cycle of the PGR/PTU (N7/L7) when
connected to a permanent 120V power supply and the heater is turned on and off by a remote 24V thermostat.
Note:
If the flame is not sensed during sequence T3 then the burner will automatically begin re-ignition sequence T2.
The ignition sequence will be repeated three times with a 60 second inter-purge. If the flame is not re-
established the heater will go to lockout.
Содержание PGR 100-L5
Страница 47: ...Form 43343120 46 July 2021 18 0 CONTROL COMPONENT LOCATION ...
Страница 49: ...Form 43343120 48 July 2021 20 0 TROUBLESHOOTING GUIDE SINGLE STAGE N5 L5 ...
Страница 50: ...Form 43343120 July 2021 49 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Страница 51: ...Form 43343120 50 July 2021 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Страница 52: ...Form 43343120 July 2021 51 20 8 TROUBLESHOOTING GUIDE TWO STAGE N7 L7 ...
Страница 53: ...Form 43343120 52 July 2021 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...
Страница 54: ...Form 43343120 July 2021 53 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...
Страница 56: ...Form 43343120 July 2021 55 21 10 REMOVING GAS VALVE AND MANIFOLD ASSEMBLY 21 11 AIR SWITCH PRESSURE CHECK ...