Form 43343120
July 2021
-23-
16.
Lift the heater into place and attach to the tube support brackets previously installed to the ceiling. Use the
3/8” x 1/2” screws, spring lock washers and hex nuts supplied in the fastener kit.
17.
Install (2) side rails on the burner end of heater and align with edge of reflector. The side rail rests inside the
reflector lip. Attach each side rail to the reflector from the top using (3) #8 sheet metal screws provided.
18.
Slide end of side rail into flange of end reflector and secure with (1) #8 sheet metal screw provided. Finish
securing the end reflector using (4) #8 sheet metal screws provided.
19.
Secure support grille to end reflector with (4) #8 sheet metal screw provided.
Содержание PGR 100-L5
Страница 47: ...Form 43343120 46 July 2021 18 0 CONTROL COMPONENT LOCATION ...
Страница 49: ...Form 43343120 48 July 2021 20 0 TROUBLESHOOTING GUIDE SINGLE STAGE N5 L5 ...
Страница 50: ...Form 43343120 July 2021 49 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Страница 51: ...Form 43343120 50 July 2021 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Страница 52: ...Form 43343120 July 2021 51 20 8 TROUBLESHOOTING GUIDE TWO STAGE N7 L7 ...
Страница 53: ...Form 43343120 52 July 2021 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...
Страница 54: ...Form 43343120 July 2021 53 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...
Страница 56: ...Form 43343120 July 2021 55 21 10 REMOVING GAS VALVE AND MANIFOLD ASSEMBLY 21 11 AIR SWITCH PRESSURE CHECK ...