
ELECTRICAL INSTRUCTIONS
ELECTRICAL REQUIREMENTS:
120 Volts A.C., 60 hz.,
2 wire, single phase,
15 amp wiring required.
WARNING:
CHASSIS MUST BE GROUNDED TO
PREVENT POSSIBLE SHOCK HAZARD.
DO NOT ASSUME A PLUMBING LINE
WILL PROVIDE SUCH A GROUND.
WARRANTY IS VOID IF UNIT IS CONNECTED TO ANY VOLTAGE OTHER THAN
SPECIFIED ABOVE AND ON NAMEPLATE.
1. Electrician must provide the conduit and wire for hookup.
2. Power is to be left
OFF
throughout installation.
3. Electrical Service is connected via the factory supplied power cord located on the left front
corner of the oven.
4. On models with optional Smoke Extractor,
electrician must provide conduit and wire
for hookup from Junction Box above the
Smoke Extractor Motor on the top of the
pit to the Exhaust fan. Make electrical
connections inside the Junction box.
NOTE:
THIS IS NOT A POWER SUPPLY
CONNECTION. IT IS FOR A FAN
CONNECTION ONLY.
NOTE: 125 V.A.C., 1/4 hp
maximum connected load,
1100 cfm fan rating recom-
mended.
5. If venting or gas connections are to be
done later, be sure that power is
OFF
.
16
EXHAUST
FAN
CONDUIT
SMOKE
EXTRACTOR
power
cord