PERIODIC MAINTENANCE
SECTION 4:
MODELS: GC-2 & GC-3
Item F: A Steam Solenoid Valve is provided for each compartment and will open when energized to
allow steam entry into the compartment. This valve will remain de-energized and closed if the Timer
reads '0' and/or the Operating Handle is in the released position.
Item G: An Exhaust Solenoid valve is provided for each compartment and operates in reverse to Item
F; that is, it will close when energized thus seating the steam, provided by the Steam Valve, within
the compartment.
ANY FOREIGN MATERIAL, OTHER THAN STEAM OR WATER, SHOULD
NOT BE ALLOWED TO EXHAUST THROUGH THIS VALVE. AFTER
OPERATION WIPE AND REMOVE FOOD OR ANY OTHER PARTICLES
FROM EACH COMPARTMENT BOTTOM.
A stainless steel strainer is provided in each compartment just ahead of the exhaust port as a
protective device for this valve. Remove, clean and replace if excessive food and/or dirt accumulation
is evident.
IF PARTICULARLY GREASY FOODS HAVE BEEN COOKED IN THE
COMPARTMENT, DEPOSITS MAY ACCUMULATE IN EXHAUST VALVES AND
MUST BE REMOVED BY CLOSING DOOR, SEALING COMPARTMENT, SETTING
TIMER AND AT FREQUENT INTERVALS PULL OUT AND RELEASE OPERATING
HANDLE TO BLOW STEAM THROUGH VALVE AND DISSOLVE GREASE.
Item H: A Pressure Gauge is fastened to the bottom face of the Cooker Control Panel. It is plumbed to sense
pressure in the Steam Header. When compartments are inactive, it should read approximately 6 p.s.i. but will
fluctuate between 4^5 to 6 p.s.i. during the cooking cycle. Pressure above 6 p.s.i. indicates that Pressure
Regulating Valve is set too high and may set off Pressure Relief Valve (Item E).
Item I: Flue Stack Assembly is located directly behind Cooker (See Page 29, Parts No. 7 & 8) and provides
for exhaust of combustion gases.
AT LEAST TWICE A YEAR EXAMINE THAT INTERIOR OF FLUE STACK IS
CLEAN. IF ACCUMULATION OF DIRT AND/OR SOOT IS APPARENT, THE
STACK COVER AND FLUE STACK MUST BE REMOVED AND CLEANED. ALSO
PORTION OF FLUE EXTENDING BELOW CABINET SURFACE TO BOILER MUST
BE CLEANED.
14
Содержание CQ-325S
Страница 10: ...PERIODIC MAINTENANCE SECTION 4 MODELS GC 2 GC 3 FIG 2 SIDE VIEW 8 ...
Страница 14: ...PERIODIC MAINTENANCE SECTION 4 MODELS 6C 2 GC 3 FIG 3 12 EXHAUST TO DRAIN STEAM IN ...
Страница 25: ...PARTS LIST SECTION 7 COMPARTMENT DOOR ASSEMBLY FIG 4 23 ...
Страница 28: ...PARTS LIST SECTION 7 COOKER ASSEMBLY FIG 5 25 ...
Страница 30: ...PARTS LIST SECTION 7 COOKER CONTROLS FIG 6 27 ...
Страница 32: ...PARTS LIST MODELS GC 2 GC 3 SECTION 7 CABINET FIG 7 29 ...
Страница 34: ...PARTS LIST SECTION 7 MODELS GC 2 GC 3 GENERATOR CONTROL BOX ASSEMBLY FIG 8 31 OVERRIDE ...
Страница 36: ...PARTS LIST SECTION 7 MODELS GC 2 GC 3 GDA 2 GHD 2 GENERATOR ASSEMBLY FIG 9 33 ...
Страница 38: ...PARTS LIST FIG 10 35 SECTION 7 MODELS GC 2 GC 3 GDA 2 GDH 2 GAS BOILER ASSEMBLY BOILER RATED 250 000 BTU HR ...
Страница 40: ...WIRING DIAGRAM 37 SECTION 8 MODELS GC 2 GC 3 ...
Страница 41: ...WIRING DIAGRAM SECTION 8 MODEL GDA 2 38 ...
Страница 42: ...WIRING DIAGRAM 39 SECTION 8 MODEL GHD 2 ...
Страница 43: ...WIRING DIAGRAM MODELS EDA 2 SCDA 2 GDA 2 DDA 2 SECTION 9 SUPPLEMENT ...