INSTALLATION & SERVICE CONNECTIONS
SECTION 1: MODELS: GC-2 & GC-3
FIG. 1
A
B
C
D
E
F
G
H
J
K
L
Inches
5 ½
9
6
21
6 ½
4 ½
18
3
10 ½ 3 ½
7
mm
138
228
155
533
163
113
457
76
267
89
178
LEGEND
GC Supply gas through 3/4" pipe with pressure of approx. 7" W.C. For propane use IT'
W.C. pressure. A gas shut off valve must be installed in supply piping convenient
and adjacent to appliance.
EC Unless otherwise specified. Field Wire Electrical Connection to be 120 Volts, 60
Hertz single phase with grounding wire.
DR Appliance drain is 2" pipe size. Provide open air gap type drain.
CW Cold Water supply to Boiler. Provide 3/8" copper tube. A Backflow Prevention Device
acceptable to BOCA Code or equivalent must be installed in this line.
ST Steam take-off locations to supply steam to adjacent units if desired.
2
Содержание CQ-325S
Страница 10: ...PERIODIC MAINTENANCE SECTION 4 MODELS GC 2 GC 3 FIG 2 SIDE VIEW 8 ...
Страница 14: ...PERIODIC MAINTENANCE SECTION 4 MODELS 6C 2 GC 3 FIG 3 12 EXHAUST TO DRAIN STEAM IN ...
Страница 25: ...PARTS LIST SECTION 7 COMPARTMENT DOOR ASSEMBLY FIG 4 23 ...
Страница 28: ...PARTS LIST SECTION 7 COOKER ASSEMBLY FIG 5 25 ...
Страница 30: ...PARTS LIST SECTION 7 COOKER CONTROLS FIG 6 27 ...
Страница 32: ...PARTS LIST MODELS GC 2 GC 3 SECTION 7 CABINET FIG 7 29 ...
Страница 34: ...PARTS LIST SECTION 7 MODELS GC 2 GC 3 GENERATOR CONTROL BOX ASSEMBLY FIG 8 31 OVERRIDE ...
Страница 36: ...PARTS LIST SECTION 7 MODELS GC 2 GC 3 GDA 2 GHD 2 GENERATOR ASSEMBLY FIG 9 33 ...
Страница 38: ...PARTS LIST FIG 10 35 SECTION 7 MODELS GC 2 GC 3 GDA 2 GDH 2 GAS BOILER ASSEMBLY BOILER RATED 250 000 BTU HR ...
Страница 40: ...WIRING DIAGRAM 37 SECTION 8 MODELS GC 2 GC 3 ...
Страница 41: ...WIRING DIAGRAM SECTION 8 MODEL GDA 2 38 ...
Страница 42: ...WIRING DIAGRAM 39 SECTION 8 MODEL GHD 2 ...
Страница 43: ...WIRING DIAGRAM MODELS EDA 2 SCDA 2 GDA 2 DDA 2 SECTION 9 SUPPLEMENT ...