Preparation Overview
The purpose of the preparation section is to help
you prepare your machine for operation. The list
below outlines the basic process. Specific steps
for each of these points will be covered in detail
later in this section.
The typical preparation process is as follows:
1.
Unpack the machine and inventory the
contents of the box/crate.
2.
Clean the machine and its components.
3.
Identify an acceptable location for the
machine and move it to that location.
4.
Level the machine and either bolt it to the
floor or place it on mounts.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation.
6.
Connect the machine to the power source.
7.
Test run the machine to make sure it
functions properly and is ready for operation.
Serious personal injury could occur if
you connect the machine to power before
completing the setup process. DO NOT
connect power until instructed to do so later
in this manual.
-12-
For Machines Mfd. Since 10/20
South Bend Tools
Model SB1091
P R E P A R A T I O N
Required for Setup
The items listed below are required to
successfully set up and prepare this machine for
operation.
For Lifting
• A forklift, hoist, boom crane, or other power
lifting device rated for the weight of the
machine.
• Lifting Strap or Chain (rated for at least
1000 lbs.)
For Power Connection
• A power source that meets the minimum
circuit requirements for this machine (see
Power Supply Requirements on Page 13
for details).
For Assembly
• Safety Glasses (for each person)
• Straightedge 4' (or longer)
• Open-End Wrench 12/14mm
• Dust Collection System
• 4" Dust Hose (length as needed)
• 4" Hose Clamp
Содержание SB1091
Страница 60: ...southbendtools com Printed In Taiwan KS21028 ...