47
Appendix
D
D
Brief Maintenance Information
The following list shows the basic guidelines for maintenance. For more details, please refer to the service manual.
Periodic replacement/periodic check/cleaning
SRX-R105/S105
Part name
Time required
for check
Time required
for replacement
1,000
2,000
3,000
4,000
5,000
6,000
10,000 15,000 20,000
Check points
Lamp bulb*
-
1 hour
Time, flicker
Lamp house*
1 minute
-
Peeling-off, damage of
reflector (note: check
at every 1,000H after
10,000H)
Fan
2 minutes
10 minutes
Noise
Shift block
assembly**
20 minutes
2 hours
Contrast, blemish,
uniformity
Combination
prism
30 minutes
30 minutes
Crack, luminance level
B-ch pre-PBS
block
30 minutes
30 minutes
***
Crack, luminance level
(note: recommend
replacement at every
20,000H)
PS converter
30 minutes
30 minutes
-
-
Burns, luminance level
SRX-R110/S110
Part name
Time required
for check
Time required
for replacement
800
1,600
2,400
3,200
4,000
4,800
9,600
14,400 19,200
Check points
Lamp bulb*
-
1 hour
Time, flicker
Lamp house*
1 minute
-
Peeling-off, damage of
reflector (note: check
at every 800H after
9,600H)
Fan
2 minutes
10 minutes
Noise
Shift block
assembly**
20 minutes
2 hours
Contrast, blemish,
uniformity
Combination
prism
30 minutes
30 minutes
Crack, luminance level
B-ch pre-PBS
block
30 minutes
30 minutes
***
***
Crack, luminance level
(note: recommend
replacement at every
9,600H)
PS converter
30 minutes
30 minutes
Burns, luminance level
* Includes lamp house ventilation filter cleaning.
** Includes 3D gamma fine tuning.
*** It is recommended to replace Pre-PBS Block (B-ch).
Содержание SXRD SRX-R105
Страница 1: ......
Страница 32: ...32 SRX series 4K Projector System Installation Guide ...
Страница 33: ...33 2 Overview of the SRX series Projectors Appendix ...
Страница 51: ...51 Appendix F ...