19
6
Installation Requirements
6-3. Electrical power requirements
When setting up the power supply for the projector, please adhere to the following:
• The SRX-R105 and SRX-S105 work between 100 and 240 V AC.
• The SRX-R110 and SRX-S110 work between 200 and 240 V AC.
• The power line must be single phase. DO NOT CONNECT to 3 PHASE POWER
• Prepare the ground line.
• When connecting to 200 volt system, the projector connections should measure as follows:
- 200 - 240 between the hot lead and the neutral lead
- 100 - 120 between the hot lead and the ground lead
- 100 - 120 between the neutral lead and the ground lead
• Use of a NEMA L6-30 AC connector is recommended for 200 V AC or higher voltages.
• Use an AC power cord that supports 8AWG, 250 V, 40 A or higher.
• Use a three-wire power cord to the AC IN terminal on the projector.
• For SRX-S110/R110, a 30 ampere circuit breaker is required in the distribution board.
- Do not use a twin 20 amp service
• For SRX-R105/S105, a circuit breaker that satisfies proper electric capacity is required in the distribution board.
Specifications on power requirements
N
L
8 AWG cable
250 V, 40 A or higher
Breaker
Distribution board
SRX-S110/SRX-R110
SRX-S105/SRX-R105
Power requirements
200 to 240 V AC, 50/60 Hz
100 to 240 V AC, 50/60 Hz
Power consumption
Approx. 5.4 kW (Standby mode: 40 W)
Approx. 3.0 kW (Standby mode: 40 W)
Current consumption
30 to 22 A
30 to 12.5 A
Содержание SXRD SRX-R105
Страница 1: ......
Страница 32: ...32 SRX series 4K Projector System Installation Guide ...
Страница 33: ...33 2 Overview of the SRX series Projectors Appendix ...
Страница 51: ...51 Appendix F ...