NW-A1000
6
3-3. LITHIUM ION BATTERY
3-4. CABINET (INNER)
3
bracket (HDD)
2
two screws
(B1.4)
1
two sheets (electrostatic CU)
4
two screws
(B1.4)
6
connector (CN9001)
7
lithium ion battery
5
Note: Do not close the hole of bracket (HDD) when you paste the sheets (electrostatic CU).
hole
2
two claws
sheet (cabinet middle) (AEP, UK, Korean)
2
two claws
3
cabinet (upper)
5
sheet (cabinet)
(US, Canadian, Australian)/
sheet (ESD)
(AEP, UK, Korean)
4
cabinet (inner) sub assy
button side
cabinet (upper)
ditch
1
sheet (HD)
tweezers
1
sheet (HD)
2
sheet (HD)
3
1
Hang claw and ditch of cabinet (upper) completely.
Note: Do not damage it
when you peel off sheet (ESD)
from sheet (cabinet middle).
tweezers
claw
-BOTTOM VIEW-
– Installation procedure of sheet (HD) –