1
BFC-1
1.
OUTLINE
1-1.
OUTLINE ......................................................................1-1
2.
PACKING
2-1.
BFC-1.............................................................................2-1
2-2.
BIN UNIT .....................................................................2-2
2-3.
RACK MOUNT KIT ...................................................2-3
2-4.
BKFC-100
(Optional: for RS-422A serial interface) .......................2-4
2-5.
BKFC-210 (Hand conversion kit for DVCAM) ............2-4
3.
INSTALLATION CONDITIONS
3-1.
EXTERNAL DIMENSION AND MASS ..................3-1
3-1-1. External Dimension ................................................3-1
3-1-2. Mass ........................................................................3-2
3-2.
INSTALLATION CONDITION ...................................3-2
3-2-1. Operating Condition ...............................................3-2
3-2-2. Notes on Installing Place ........................................3-2
3-2-3. Door Dimension and Ceiling Height ......................3-3
3-2-4. Maintenance Space .................................................3-4
3-3.
POWER SUPPLY .........................................................3-5
3-3-1. AC Power Supply ...................................................3-5
3-3-2. Power Cord .............................................................3-5
3-4.
TRANSPORTATION.....................................................3-5
3-4-1. Move with Caster of Console .................................3-5
3-4-2. Move with Fork Lift ...............................................3-5
4.
INSTALLATION AND
ASSEMBLING PROCEDURE
4-1.
PRECAUTION ..............................................................4-1
4-2.
PREPARATION.............................................................4-1
4-2-1. Combination to Install Equipments ........................4-1
4-2-2. Fixture.....................................................................4-1
4-2-3. Front Door Removal ...............................................4-2
4-3.
INSTALLATION FLOWCHART.................................4-3
4-4.
CONSOLE FIXING......................................................4-4
4-5.
VOLTAGE SELECTOR CHECK................................4-5
4-6.
CIRCUIT BREAKER CHECK ...................................4-5
4-7.
SWITCH ON CPU-107 BOARD SETTING..............4-6
4-8.
SWITCH ON IF-373 BOARD SETTING..................4-8
4-9.
SHIPPING PLATE REMOVAL ..................................4-9
4-10. VTR/BIN UNIT INSTALLATION
(FOR D-2 VTRs) .........................................................4-10
4-10-1. Select BIN Unit and Rack Mount Kit....................4-10
4-10-2. Installing the Rack Mount Kit and VTR ...............4-11
4-10-3. Installing the Bin Unit ...........................................4-21
4-11. VTR/BIN UNIT INSTALLATION (FOR BETACAM,
HDCAM, MPEG IMX and S-VHS VTRs)....................4-24
4-11-1. Select BIN Unit and Rack Mount Kit....................4-24
4-11-2. Installing the Rack Mount Kit and VTR ...............4-25
4-11-3. Installing the Bin Unit ...........................................4-36
4-12. VTR/BIN UNIT INSTALLATION
(FOR DVCAM) ............................................................4-39
4-12-1. Installing the Rack Mount Kit and VTR ...............4-39
4-12-2. Installing the Bin Unit ...........................................4-49
4-12-3. Remodeling the Hand Assembly
(for DVCAM)........................................................4-52
4-12-4. Moving of Cassette Sensor Board .........................4-58
4-13. CABLE CONNECTION/DISPOSITION.....................4-60
4-13-1. Control Digital System ..........................................4-60
4-13-2. Video/REF (Digital System)..................................4-62
4-13-3. Audio/Time Code (Digital System).......................4-64
4-13-4. Control Analog System .........................................4-66
4-13-5. Video/REF (Analog System) .................................4-68
4-13-6. Audio/Time Code (Analog System) ......................4-70
4-13-7. Cable Disposition ..................................................4-72
4-14. CASSETTE LOADING AND REMOVAL................4-72
5.
OPERATION CHECK
.............................................5-1
6.
INPUT/OUTPUT INTERFACE
6-1.
MATCHING CONNECTORS
AND CABLES..............................................................6-1
6-2.
SIGNAL INPUTS AND OUTPUTS ..........................6-2
TABLE OF CONTENTS