1-14
FVS-1000 MMP1
1-10. Installation Procedure
6. Removing the screws fixed during the transportation
Remove the vinyl tape and two BP screws fixed during the transportation.
n
Store the removed BP screws for transportation in the drawer of the unit.
7. Prevention of falling down
To prevent the FVS-1000 from falling down by an earthquake etc., it is recommended to fix the FVS-1000.
w
To prevent the FVS-1000 from falling down or moving, be sure to fix the FVS-1000 to the ceiling which
has the enough strength using a chain etc.
Fixing to the ceiling or pillar (using eyebolt)
On the top of the FVS-1000, there are four eyebolts (M12). Connect the eyebolts and the pillar or ceiling
which has enough strength by a chain etc. with the chain slacked.
Eyebolts
Eyebolts
BP screw
BP screw
Vinyl tape
Содержание BKFV-100
Страница 4: ......
Страница 8: ......
Страница 34: ......
Страница 38: ...2 4 FVS 1000 MMP1 2 3 Location of Main Parts FVS T1000 Rear panel 1 1 1 1 1 7 6 8 9 1 1 1 5 4 2 3 Rear side ...
Страница 44: ...2 10 FVS 1000 MMP1 2 3 4 Location of Sensors 2 3 Location of Main Parts Front side 4 5 6 8 8 9 7 0 3 2 1 ...
Страница 130: ...7 4 FVS 1000 MMP1 O A 8321 649 A FILTER ASSY BOX S 1 758 295 11 IR UV CUT FILTER S 1 517 872 11 LAMP WITH PLASTIC CASE ...
Страница 132: ......
Страница 136: ......