Table of contents
7.1.1 Taking photos to document installation....................................................56
7.2 Filling in the commissioning report (optional)................................................56
7.3 Switching on the storage system......................................................................57
7.3.1 Closing the door of the main cabinet.......................................................57
7.3.2 Switching on the grid voltage...................................................................57
7.3.3 Switching on the PV disconnector SPV................................................58
7.3.4 Switching on the fuse switch F1..............................................................58
7.4 Running the commissioning assistant..............................................................59
7.4.1 Establishing connection to storage system.............................................59
7.4.2 Establishing connection to storage system............................................59
8 Decommissioning.........................................................................................61
8.1 Switching the storage system off......................................................................61
8.2 Switching the storage system off to electrically isolate it.............................62
9 Troubleshooting...........................................................................................63
10 Uninstallation and disposal.......................................................................64
10.1.1 Uninstallation and disposal......................................................................64
10.1.2 Disposal....................................................................................................64
11 Installation photos......................................................................................65
12 Commissioning report (optional)..............................................................67
KD-421 | Part no. 22136 | EN | X03