
5
Installation
5 Installation
5.1 Scope of delivery
►
Check the following scope of delivery to ensure it is complete.
Figure 4: Scope of delivery
A Scope of delivery for main
cabinet
B Scope of delivery for battery
module
C Scope of delivery for big extension
cabinet
1 Main cabinet
1 Battery module
1 Big extension cabinet
2 Numbering for battery modules
2 Fuse plug
2 Levelling mat
3 RJ-45 coupling
3 BMS communication line
3 Locking nut
4 Power meter WM 271
4 DC line red
4 Contact disc
5 Modbus line
5 DC line black
5 Edge protection
6 Current transformer KSW60-3
7 Mains line
D Scope of delivery for small
E Scope of delivery for Pedestal
8 Installation instructions
extension cabinet
(optional)
9 Operating instructions
1 Small extension cabinet
1 Pedestal
10 Miniature Circuit Breaker B16
2 Levelling mat
11 PV plug-in connector minus
3 Locking nut
12 PV plug-in connector plus
4 Contact disc
5 Edge protection
20 / 68
KD-421 | Part no. 22136 | EN | X03
A
B
3x
K
L
K
L
K
L
1
2
3
KSW
1x
1x
1x
1x
1x
1x
1x
1x
1x
+49 (0) 8304 / 92933 - 444 · inf o@ sonne nba tte rie .de ·
w ww.sonne nbatt er ie .de
Installationsanleitung sonnenBatterie eco 8.0
– für Elektrofachkräfte –
+49 (0) 8304 / 92933 - 444 · inf o@ sonne nba tte rie .de ·
w ww.sonne nbatt er ie .de
Installationsanleitung sonnenBatterie eco 8.0
– für Elektrofachkräfte –
1x
1x
1x
1x
1x
1x
1x
C
D
E
1x
1x
1x
2x
2x
1x
1
2
4
6
7
8
9
5
3
11
12
1
2
3
4
5
1
2
3
4
1x
2
1
1
A1 A2
5
2x
10
2x
2x
3
4
5
2x