English
15
Copyright © 2013 Somfy SAS. All rights reserved.
5
7
8
Drill a hole in the gate leaves with a diameter of 8.
Install the cylinder.
Clip the unlocking mechanism on the catch to secure it.
Reposition the gate leaf mounting bracket then mark the mounting
holes
in the centre of the oblong holes.
8
10
7
9
The third mounting hole must only be drilled after self-
learning of the gate leaf travel.
The washers (11) provided must be fitted.
Check before proceeding to the next step
Have you checked that the cylinders are perfectly horizontal?
Secure the gate leaf mounting bracket to the two points on the gate
leaves using screws suited to the reinforcement material and the
washers (11) supplied.
Содержание SGS 201
Страница 1: ...5073893A SGS 501 EN Operating and installation guide DE Montage und Gebrauchsanleitung ...
Страница 70: ......
Страница 71: ......