AROW Series
Data Diode
Installation and Operation
6-3
If a failure occurs or an upgrade required, undo the captive screws and
pull the card out.
To insert a board, line it up with the internal guide rails and push it in until
the board panel is flush with the unit's back panel.
The board will click into place as the connector mates.
Finally, secure the 2 captive screws.
Содержание AROW Series
Страница 2: ...AROW Series Data Diode Installation and Operation ...
Страница 8: ...AROW Series Data Diode Installation and Operation 1 5 15 INDEX 15 1 ...
Страница 18: ...AROW Series Data Diode Installation and Operation 4 3 ...
Страница 69: ...AROW Series Data Diode Installation and Operation 11 4 This page intentionally blank ...