46
d) e)
4
– Connect the wires on the ON/OFF connector contact ( Figure 30-f); direct the wires
through the cable gland to the interior of the unit (Figure 30-g);
f) g)
6
– Assemble the interface at the appropriate location on the unit and position the remote
control (On/Off contact) switch to "remote" (Figure 30-h);.
h)
i)
8 - Connect the interface cable to the electronic plate on the communication card
(Servizi 5J).
Содержание Alpes 10 kW
Страница 21: ...18 Figure 16 Side view of the installation without a chimney illustrating the inspection point a ...
Страница 22: ...19 b c Figure 17 Examples of standard installations ...
Страница 52: ...49 b c d e f g Figure 33 Installation of the UPS kit ...
Страница 54: ...51 a b Figure 35 a Grid b Burning basket Figure 36 Ash basket Figure 6 Cleaning the burning basket ...
Страница 61: ...58 a b c d e f ...
Страница 70: ...67 13 5 Symbols Figure 60 Symbols ...
Страница 71: ...68 14 Electrical diagram of the Free Standing Pellet Fire unit Figure 61 Electrical diagram ...
Страница 78: ...75 ...