15
Backboiler model - Douro 17kW and Douro 23kW
- Top front cover
To install the top front cover, place it over the unit (Figure 13-a) and then tighten the
screws that secure it to the top panel of the unit (Figure 13-b).
a)
b)
Figure 13
– Assembly of the top front cover
- Bottom front cover
The bottom front cover can be assembled by removing the screws located on the bottom
part of the unit. Then place the part in the appropriate position (Figure 14-a) and replace
and tighten the screws again (Figure 14-b)
a)
b)
Figure 14
– Assembly of the bottom front cover
Содержание Alpes 10 kW
Страница 21: ...18 Figure 16 Side view of the installation without a chimney illustrating the inspection point a ...
Страница 22: ...19 b c Figure 17 Examples of standard installations ...
Страница 52: ...49 b c d e f g Figure 33 Installation of the UPS kit ...
Страница 54: ...51 a b Figure 35 a Grid b Burning basket Figure 36 Ash basket Figure 6 Cleaning the burning basket ...
Страница 61: ...58 a b c d e f ...
Страница 70: ...67 13 5 Symbols Figure 60 Symbols ...
Страница 71: ...68 14 Electrical diagram of the Free Standing Pellet Fire unit Figure 61 Electrical diagram ...
Страница 78: ...75 ...