1. Attach the side fascia – the roof end boards (POS. 20) – that is installed directly
under the roof boards.
2.
Ensure it is even with the most out-extended roof boards
. These boards are
designed to frame the roof edge and to cover any uneven edge.
3. Use 5 units of 1 1/8" screws per board. You can fasten from the top of the roof
boards or from under the roof through the fascia boards into the roof boards.
4.
M
ount the
decorative diamonds
(POS. 21) with screws, as shown in the
diagram.
NOTE
. If installing drip edge with your roofing, skip the decorative diamond
installation, or leave it for the end after your roofing is finished.
STEP 13 - INSTALL SIDE FASCIA
35
BRIGHTOLN 10 x 10 ft, 1
3
/
8
"
Содержание BRIGHTON
Страница 4: ...BRIGHTON 10 ft x 10 ft 1 3 8 ...
Страница 13: ...13 1 FLOOR JOIST DIAGRAM Position Dimension in Quantity 1 109 3 8 x 2 3 8 x 1 1 2 7 BRIGHTOLN 10 x 10 ft 1 3 8 ...
Страница 40: ...40 STEP 16 FASTEN THE DOOR PANELS WINDOW 3x25mm BRIGHTOLN 10 x 10 ft 1 3 8 4x40mm x4 ...
Страница 42: ...INSIDE OUTSIDE LOCK CYLINDER STEP 17 INSTALL DOOR WINDOW HARDWARE 42 BRIGHTOLN 10 x 10 ft 1 3 8 ...