After the shed has had time to settle, typically 2 – 4 weeks, you
may drill the holes to hold the left door panel locked in place.
1. Prepare a drill bit that's thicker than the pin bolts, a.k.a. flush bolts, on the
left door panel.
2. Close the left door panel, and push the pin bolt out.
3. Wiggle the door gently, so the pin leaves a mark on the door frame.
4. Drill about 1" deep hole at the marked spot, ensuring a right drill and door
frame angle.
5. Repeat the same steps for the bottom pin bolt.
TIP
. A dull drill bit will make this task difficult. If possible,
use a newer drill bit
, and
start with a smaller drill bit
to give some room for error when aiming the first time.
45
BRIGHTOLN 10 x 10 ft, 1
3
/
8
"
STEP 18 - DRILL HOLES FOR DOOR PIN/FLUSH BOLTS
Содержание BRIGHTON
Страница 4: ...BRIGHTON 10 ft x 10 ft 1 3 8 ...
Страница 13: ...13 1 FLOOR JOIST DIAGRAM Position Dimension in Quantity 1 109 3 8 x 2 3 8 x 1 1 2 7 BRIGHTOLN 10 x 10 ft 1 3 8 ...
Страница 40: ...40 STEP 16 FASTEN THE DOOR PANELS WINDOW 3x25mm BRIGHTOLN 10 x 10 ft 1 3 8 4x40mm x4 ...
Страница 42: ...INSIDE OUTSIDE LOCK CYLINDER STEP 17 INSTALL DOOR WINDOW HARDWARE 42 BRIGHTOLN 10 x 10 ft 1 3 8 ...