1.
Continue assembling
front wall-boards
(
POS. 5),
back wall-boards
(
POS. 4), and
side wall-boards
(
POS. 3) up to the
4
th
level of side walls.
2.
Build the frame for the double door & window combo made of the
lower strip of
the
door
(POS. 7a), the
side strip of the door
(POS. 7b), the
top strip of the door
(POS. 7d) and the
inside strips of a double door
(POS. 7c).
3.
Lay out all the door frame and window combo parts on the ground.
4.
Check door hinge direction against the door panels - aluminum threshold sits at the
bottom, and hinges face outside.
5.
Using long wood screws provided, screw frame pieces at the predrilled holes at
each corner and inner frame strips. Make sure the
screws go all the way into the
U-shaped channel
.
a. Screw POS. 7b and POS. 7c to POS. 7a;
b. Slide in the tall windows;
c. Screw the POS. 7d to POS. 7b and POS. 7c;
6.
Slide the assembled frame into the front wall opening.
NOTE
. It's easier to install the door and windows when you only have assembled the
first 4 layers of boards; This way, you do not need to lift the assembled door & window
frame very high to slide it in.
DO NOT
hang door panels at this time.
STEP 4 - ASSEMBLE WALLS AND DOOR FRAME
18
BRIGHTOLN 10 x 10 ft, 1
3
/
8
"
Содержание BRIGHTON
Страница 4: ...BRIGHTON 10 ft x 10 ft 1 3 8 ...
Страница 13: ...13 1 FLOOR JOIST DIAGRAM Position Dimension in Quantity 1 109 3 8 x 2 3 8 x 1 1 2 7 BRIGHTOLN 10 x 10 ft 1 3 8 ...
Страница 40: ...40 STEP 16 FASTEN THE DOOR PANELS WINDOW 3x25mm BRIGHTOLN 10 x 10 ft 1 3 8 4x40mm x4 ...
Страница 42: ...INSIDE OUTSIDE LOCK CYLINDER STEP 17 INSTALL DOOR WINDOW HARDWARE 42 BRIGHTOLN 10 x 10 ft 1 3 8 ...