LED indicator
Operating condition
Description
green:
standby (night)
input voltage < 300 VDC
yellow:
red:
green:
initialization
unit is being initialized
yellow :
red:
green:
stop
input voltage low <325V
yellow:
red:
green:
stop
input voltage high
yellow:
> 550V
red:
(600 VDC is the maximum allowable
PV open circuit voltage)
green:
waiting,
presence of valid grid conditions
yellow:
checking grid
Is being checked
red:
green:
waiting for
grid voltage
yellow:
AC disconnect/breaker to be closed
Is absent
red:
green:
feeding grid
normal daytime operation
yellow:
MPP or constant voltage mode
red:
green:
de-rating mode
reduction of power fed to the grid
yellow:
due to increased temperature of
red:
the heat sink
green:
waiting for
available DC power is too low
yellow:
stronger sun
red:
green:
ground fault
ground fault of the PV panels
yellow:
see chapter 5
red:
green:
GFDI fuse failure
GFDI fuse is defective
yellow:
see chapter 5
red:
green:
failure
internal or external failure, exact
yellow:
description on blink code
red:
call Solectria Renewables
green:
utility failure
a failure of the utility (i.e. a blackout or
brownout) has occurred
yellow:
unit attempts to restart every five minutes
red:
Содержание PVI 13KW
Страница 9: ...PVI13KW Installation and Operation Manual DOC 020028 rev 006 9 Fig 2 2a PVI13KW Mounting Diagram ...
Страница 36: ...PVI13KW Installation and Operation Manual DOC 020028 rev 006 36 ...
Страница 41: ...PVI13KW Installation and Operation Manual DOC 020028 rev 006 41 Appendix D ETL early use letter ...
Страница 42: ...PVI13KW Installation and Operation Manual DOC 020028 rev 006 42 ...