![Solectria Renewables PVI 13KW Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/solectria-renewables/pvi-13kw/pvi-13kw_installation-and-operation-manual_1314673010.webp)
PVI13KW Installation and Operation Manual
DOC-020028 rev 006
10
Fig. 2.2b PVI13KW Mounting Diagram
Mounting Details
Using the mounting diagram Fig. 2.2 (a & b), choose whether floor/roof, wall or stand
mounting will be used. The inverter includes mounting feet for attachment to floors, roofs/roof
plates/roof pans or stands. It also includes mounting tabs for wall mounting. You can also use
a combination of both mounting provisions. For example, 2 bolts in floor mount feet and 2
bolts in the wall mount tabs.
It is recommended to use galvanized grade 5 or better bolts or stainless steel bolts. The correct
bolt size is 3/8” (10mm) diameter. If wall mounting is used, be sure to verify sheer and pullout
strength of anchors or other wall attachments.
WARNING:
Severe injury or death could occur if the inverter mounting fails and
the unit falls on a person.
Содержание PVI 13KW
Страница 9: ...PVI13KW Installation and Operation Manual DOC 020028 rev 006 9 Fig 2 2a PVI13KW Mounting Diagram ...
Страница 36: ...PVI13KW Installation and Operation Manual DOC 020028 rev 006 36 ...
Страница 41: ...PVI13KW Installation and Operation Manual DOC 020028 rev 006 41 Appendix D ETL early use letter ...
Страница 42: ...PVI13KW Installation and Operation Manual DOC 020028 rev 006 42 ...