![SolaX Power Triple Power T-BAT PACK-HV Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/solax-power/triple-power-t-bat-pack-hv/triple-power-t-bat-pack-hv_user-manual_1314279015.webp)
24
25
4. Installation
4. Installation
4.5.3
Connecting CAN Communication Cable
It is required for the BMS to communicate with the inverter for proper operation.
2. Connect the CAN communication cable to
the CAN connector (
Ⅱ
) which is marked in red.
Insert the other end of the CAN communication
cable to the CAN connector. Assemble the cable
gland and screw the cable nut.
1. Insert one end of the CAN communication
cable (C) which has no cable nut directly to the
BMS port of the Inverter.
BAT-
BAT+
CAN
The wire order of the communication cable is as follows:
1 2 3 4 5 6 7 8
1) White with an orange stripe
2) Orange
3) White with a green stripe
4) Blue
5) White with a blue stripe
6) Green
7) White with a brown stripe
8) Brown
Sequence
1
2
3
4
5
6
7
8
CAN
/
GND
/
CAN_H CAN_L
/
A1
B1
4.5.4
Connecting RS485 Communication Cable
For T-BAT H 5.8:
There's no need to use RS485 communicaton cable.
For T-BAT H 5.8 + 1~3 battery packs:
Connect RS485 II (
Ⅶ
for T-BAT H 5.8 or
Ⅷ
’ for HV11550) of upper battery on the
right side to RS485 I (
Ⅲ
’) of the follow-up battery pack which is on the left.
Assemble the cable gland and screw the cable nut.
Sequence
1
2
3
4
5
6
7
8
RS485I
RS485II
VCC_485
VCC_485
GND_485
GND_485
B2
B2
N-
N-
P+
P+
A2
A2
VCC_485_2
VCC_485_2
GND_485
GND_485
The wire order of the communication cable is as follows:
-
YPLUG
RS485 II
-
YPLUG
RS485 II
-
YPLUG
RS485 II
+
XPLUG
RS485 I