Safety

5

Safety

A1-HYB-G2 series

 

inverter is designed and certified to meet stringent Ul1741/IEEE 

1547 and ANSI/IEEE 62.41/62.42 lighting and surge requirements.

However, every PV installation is unique. Thus, additional external UL/NEC AC and 

DC surge protection and solid grounding practices are recommended.

Lightning and surge protection

Battery Safety Instructions

4

A1-HYB series only supports a certain type of lithium-ion battery!

(Manufacturer certified battery)

 

CAUTION!

Risk of electric shock from energy stored in the capacitor. Never 

operate on the inverter couplers, the Mains cables, battery cables, PV 

cables when power is applied. After switching off the PV, battery and 

Mains, always wait for 5 minutes to let the intermediate circuit 

capacitors discharge before unplugging DC, battery plug and Msins 

couplers.

 

CAUTION!

The unit contains capacitors that remain charged to a potentially 

lethal voltage after the 

 , battery and   supply have been 

MAINS

PV

disconnected. Hazardous voltage will be present for up to 5 minutes 

after disconnection from the power supply.        

 

CAUTION!

When accessing the internal circuit of the inverter, it is very important 

to wait 5 minutes before operating the power circuit or demounting 

the electrolyte capacitors inside the device. Do not open the device 

beforehand since the capacitors require time to sufficiently 

discharge!    

 

CAUTION!

CAUTION!

Possible damage to health as a result of the effects of radiation!

Do not stay closer than 7.87in/20cm to inverter for a long time.

CAUTION!

Danger of burn injuries due to hot enclosure parts!

During operation, the upper lid of the enclosure and the enclosure 

body may become hot.

Only touch the lower enclosure lid during operation.

Authorized service personnel must use insulated tools when installing 

or working with this equipment.

 

CAUTION!

NOTE!

The inverter is heavy. Use of lift equipment is recommended. 

NOTE!

Make sure that existing wiring is in good condition and that wire is 

not undersized.

NOTE!

Measure the voltage between terminals UDC+ and UDC- with a 

multi-meter (impedance at least 1Mohm) to ensure that the device is 

discharged before beginning work (35VDC) inside the device.

Keep away from flammable and explosive materials to avoid fire.

Do not install application in a corrosive environment where it may be 

exposed to ammonia, corrosive gases, acids, or salts (eg: chemical 

plant, fertilizer storage areas, tanneries, near volcanic ash eruption).

WARNING!

Never touch either the positive or negative pole of the 

 connecting 

PV

device. Never touch both poles at the same time. 

WARNING!

A1-HYB-G2 Series inverter should be coupled with a high voltage battery. The battery 

must comply with UL 1973 and must be intrinsically safe. 

As accumulator batteries may contain potential electric shock and short-circuit 

current dangers, to avoid accidents that might be thus resulted, the following 

warnings should be observed during battery replacement:

1: Do not wear watches, rings or similar metallic items.

2: Use insulated tools.

3: Put on rubber shoes and gloves.

4: Do not place metallic tools and similar metallic parts on the batteries.

5: Switch off loads connected to the batteries before dismantling battery 

connection terminals.

6: Only personnel with proper expertise

 carry out the maintenance of  

 should

accumulator batteries.

Содержание A1-AC-G2 Series

Страница 1: ...nfo solaxpower com Copyright Declaration The copyright of this manual belongs to SolaX Power Network Technology Zhejiang Co Ltd Any corporation or individual should not plagiarize partially or fully c...

Страница 2: ...6 2 POWER CONNECTION 6 3 GROUND CONNECTION 4 TECHNICAL DATA 4 1 DC INPUT 4 2 AC LOAD 4 3 GENERAL DATA 4 4 BATTERY MANUFACTURER CERTIFIED BATTERY 4 5 EFFICIENCY SAFETY AND PROTECTION 4 6 ENVIRONMENT LI...

Страница 3: ...A1 HYB 5 0K G2 A1 HYB 6 0K G2 A1 HYB 7 6K G2 Note A1 HYB series means PV grid supported storage inverter A1 AC series means energy storage inverter There may be no solar module connected to inverter...

Страница 4: ...ies inverters are designed and tested to meet all applicable North American and International safety standards However like all electrical and electronic equipment safety precautions must be observed...

Страница 5: ...hot enclosure parts During operation the upper lid of the enclosure and the enclosure body may become hot Only touch the lower enclosure lid during operation Authorized service personnel must use ins...

Страница 6: ...tion mode to off grid mode or from off grid mode to grid connection model by using backup interface BI The inverter also has the ability to use power generated from PV arrays along with other string i...

Страница 7: ...ain panel Meter SolaX cloud DC Power AC Power Communication Cloud Battery Grid BI App Generator Load Sub panel Meter SolaX cloud DC Power AC Power Communication Cloud Main panel Existing Solar System...

Страница 8: ...the battery bank The excess power will be exported to the public grid Charges the battery during two available charging windows from PV or grid if enabled then functions as in Self use mode Note Cont...

Страница 9: ...there are no user serviceable parts inside NOTE A Inverter power box It is the essential part of the inverter This part is debugged and sealed before ex factory and there is no user servable part ins...

Страница 10: ...Voltage Max Continuous AC Power Max Continuous Current Nominal AC Frequency 2 1 16 A 5700 W 60 Hz 0 8 Leading 0 8 Lagging 90 500 Vd c AC Output Power Factor GRID OUTPUT INPUT 15 9 A 3816 VA PV INPUT...

Страница 11: ...fficiency 97 5 97 5 97 5 Model A HYB 3 8K G2 A HYB 5 0K G2 A HYB 7 6K G2 A HYB 6 0K G2 98 0 Maximum Inverter Efficiency 98 0 98 0 98 0 PV to GRID Standard FCC part15 class B IEEE1547 Rule 21 Rule14 HI...

Страница 12: ...on and commissioning must be performed by a licensed electrician in accordance with local state and National Electrical Code ANSI NFPA 70 requirements WARNING The installation and wiring connection me...

Страница 13: ...e less than the following values as shown in the following figure The height above the ground marked below is recommended assuming that three BATs are mounted If less or more BAT is mounted please low...

Страница 14: ...ately Open the package and fetch out the product Please check the accessories The packing list shows as below 23 22 Type Tool equipment Name Image Name Image Safety gloves Safety shoes Individual Prot...

Страница 15: ...WB 16 Scheme B Studs at regular intervals spaced at 16 and 32 inch Punch the holes WB 32 X4 WB C X2 WB 32 E X2 Steel material of sufficient thickness Punch the holes WB 24 X4 WB C X2 WB 32 E X2 Solid...

Страница 16: ...ke mounting on the wooden wall spaced at 32 inch as an example NOTE Scheme C Scheme D Studs at regular intervals spaced at 28 inch Punch the corresponding holes WB 28 X4 WB C X2 WB 32 E X2 Studs at re...

Страница 17: ...e in the center of each stud and keep at least 1 5in 38mm away from the edge of concrete bricks or studs before marking holes NOTE Round holes Depth 2 36 in 60 mm 10 drill c Insert the expansion tube...

Страница 18: ...wo persons and placed carefully onto the bracket Then adjust the inverter to be centered on the whole system Back view Front view c Pre mount the fixing plate on the two sides of metal cover and mount...

Страница 19: ...r load an electric arc may occur which can cause an electric shock and burns Do not touch non insulated conductors Do not touch the DC conductors Do not touch any live components of the inverter WARNI...

Страница 20: ...ed by customer Inverter communication terminal Purchased by customer 34 1 2 3 3 4 5 6 7 No Terminals Type Cross sectional Area Range Strip Length 1 PV terminals 90 C 194 F 600V Copper 10 8 AWG 0 47in...

Страница 21: ...ot be removed when the DC switch is in ON position WARNING Before inverter wiring connection Make sure no live voltages are present on PV input and AC output circuits and make sure that the DC switch...

Страница 22: ...connection C Conduit plugs for PV connection D Conduit plugs for PV connection AC wire connection DC wire connection Step 2 Remove 0 47in 12mm of insulation from the end of DC wire and the AC wire St...

Страница 23: ...thout connected wires WARNING Ensure maximum protection against hazardous contact voltages while assembling PV panel installations Both the positive and negative leads must be strictly isolated electr...

Страница 24: ...YB G2 inverter is required to protect each AC line L1 and L2 of the HYB series inverter The circuit breaker should be able to handle the rated maximum output voltage and current of the inverter AC cir...

Страница 25: ...onnection Electrical Connection 45 44 As a Lithium ion battery will be connected with HYB series inverter the battery communication should be compatible with A1 HYB G2 series inverter and the BMS must...

Страница 26: ...tion 47 46 A B C Ground Terminal a Strip the insulation of conductor by wire stripper For the specific requirement of power cable please refer to section 6 1 Overview Of All Electrical Wiring Methods...

Страница 27: ...Communication in terminal COMM IN AUX terminal MLPE terminal 6 4 1 Make Communication Connection to Another Inverter BI Inverter communication system diagram NOTE In the first inverter in the communic...

Страница 28: ...1 Pin 6 Select the CAT5 or better 24 18AWG use diagonal plier to cut off two wires and leave six wires for connection Remove 0 24in 6mm of insulation from the end of the six wires Pin 7 Pin8 Select tw...

Страница 29: ...am for communication connection steps between inverter and BI 8 pin Step 1 Strip Length Conduit 0 24in 6mm Step 2 24 18 AWG 18 16 AWG Step 3 Step 4 On the side of inverter On the side of BI Electrical...

Страница 30: ...function in SolaX Cloud App if electricity meter has been purchased The inverter will shut down with a Meter fault alert in case of meter not installed The meter communication only works when the mete...

Страница 31: ...onnection The inverter is equipped with monitoring port which can collect data and transmit it to monitoring website via an external monitoring data collector 6 4 5 1 GATEWAY WIFI 4G Connection Option...

Страница 32: ...t at the right side of the inverter Ready to install your Pocket WiFi 3 Remove the two waterproof covers of antenna with tools and route the antenna from the same hole Tighten it with nut inside 2 Plu...

Страница 33: ...ry and BI for more information on the codes displayed for error and warning messages refer to section 7 3 Download and set the APP If the system has been turned on press the inverter power on button f...

Страница 34: ...result in serious failure during upgrading 8 2 Upgrading Steps Firmware Upgrading Step 1 Contact our service support to get the update files and extract it into your U disk as follow update ARM xxx xx...

Страница 35: ...Fault U Disk Upgrade Fault Check if the U disk is correctly plugged and the file is correct Please contact SolaX Technical Support Meter Fault Meter Communication Fault Check if the communication cab...

Страница 36: ...pport Faults Diagnosis and solution Troubleshooting 67 Inter Com Fault Internal Communication Fault Check the connection between inverter and BI connects normally Or contact SolaX Technical Support Is...

Страница 37: ...iar with the requirements of safety should perform servicing and maintenance work Safety checks Safety checks should be performed at least every 12 months Please contact the manufacturer SolaX to arra...

Страница 38: ...Packaging 11 3 Storage and Transportation Decommissioning The inverters shall be transported used and operated under restricted conditions SolaX will not provide any service technical support or comp...

Страница 39: ...ackup solution Parallel operation with standalone meter 73 72 BATTERY LEGEND Negative Positive Ground PV LEGEND Negative Positive Ground AC LEGEND Ground HOT L1 HOT L2 Neutral L1 N L2 Signal LEGEND BI...

Страница 40: ...ckup solution Parallel operation with meter load center 75 74 BATTERY LEGEND Negative Positive Ground PV LEGEND Negative Positive Ground AC LEGEND Ground HOT L1 HOT L2 Neutral L1 N L2 Signal LEGEND BI...

Страница 41: ...le home backup solution with standalone meter 77 76 BATTERY LEGEND Negative Positive Ground PV LEGEND Negative Positive Ground AC LEGEND Ground HOT L1 HOT L2 Neutral L1 N L2 Signal LEGEND BI Cable BMS...

Страница 42: ...le home backup solution with meter load center 79 78 BATTERY LEGEND Negative Positive Ground PV LEGEND Negative Positive Ground AC LEGEND Ground HOT L1 HOT L2 Neutral L1 N L2 Signal LEGEND BI Cable BM...

Страница 43: ...gram 5 Partial home backup solution 81 80 BATTERY LEGEND Negative Positive Ground PV LEGEND Negative Positive Ground AC LEGEND Ground HOT L1 HOT L2 Neutral L1 N L2 Signal LEGEND BI Cable BMS Cable EPO...

Страница 44: ...ackup solution with meter load center microgrid system 83 82 BATTERY LEGEND Negative Positive Ground PV LEGEND Negative Positive Ground AC LEGEND Ground HOT L1 HOT L2 Neutral L1 N L2 Signal LEGEND BI...

Страница 45: ...Partial backup solution microgrid system 85 84 BATTERY LEGEND Negative Positive Ground PV LEGEND Negative Positive Ground AC LEGEND Ground HOT L1 HOT L2 Neutral L1 N L2 Signal LEGEND BI Cable BMS Cab...

Страница 46: ...Module Brand Module Size W Number of String Number of Panel Per String Battery Type Brand Number of Battery Attached Battery If Any Module If Any Date of Delivery Signature Please visit our warranty w...

Страница 47: ...YOUR INVERTER ONLINE WIN SOLAX POINTS Open your camera app and point your device at the QR code Wait for the camera to recognize the QR code Click banner or noti cation when it appears on the screen W...

Отзывы: