77
f
Consider applicable accident prevention guidelines
during installation.
f
Observe the applicable engineering guidelines
during roof installation.
f
Observe the applicable rules and standards during
installation and commissioning.
f
Secure people located on the roof of a building 3 m
or higher with fall protection.
f
Use cordons to protect people on the ground from
falling objects.
f
Also follow the safety instructions of all other
system components (e.g. inverters and modules).
f
Only have the system connected to the public
grid by a qualified electrician. Note the mounting
instructions delivered with modules and inverters,
as well as the mounting and wiring plan
f
Ensure that all screw connections are securely
fastened.
A4
Notes on installation
Required tools / Additional required materials
Cordless screwdriver
Allen key
5 mm and 6 mm
Tape measure
Chalk line
Torque wrench
Ballast elements
(e.g. paving slabs)