Placing supports
1. After determining the total base area of the
system, mark the distance to the front supports,
position them and connect them with a ballast
2. Place the connecting supports and measure the
distance to the front supports. The connecting
supports can still be repositioned in the course of
tray. To protect the roof membrane, four rubber
mats must be placed below each ballast tray.
the module installation. Then position the next
connecting supports.
Torque value M
A
= 15 Nm for M8 bolts
Driver: Allen key SW6
Remove plastic film
ca. 113
1 m
m