![SolarWorld Sunfix Bisun Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/solarworld/sunfix-bisun/sunfix-bisun_original-instruction-sheet_1314133016.webp)
16
16
C4
Module installation
f
Place modules on the fastening supports and tigh-
ten the module clamps with 10 Nm.
f
Beginning with the second module, before
placement, the cables are attached to the plug
Torque force
M
A
= 10 Nm
Driver for module clamping: 5mm allen key
connections and these are secured to the module
frame using cable tie clips.
Fig. C 4-1
Содержание Sunfix Bisun
Страница 23: ...23 23 D Notes...