SAFETY, INSTALLATION, AND OPERATIONS MANUAL
© The Solaria Corporation
Contents subject to change without notice.
U.S. and International patents issued and pending
Document PSC-0004 Rev 02, November 2010
7 of 12
z
Modules should be secured to the tracker open rack mounting structure using four aluminum 63mm
long frameless module clips, with
no bottom part
, which grasp the frameless module by at least
10mm.
z
The retaining clips must each provide a minimum contact area of 10mm x 63mm and be lined with
rubber to protect and grasp the module glass.
z
The center of the frameless mounting clips must be located on the long side of the frameless module
between 300mm and 400mm from the edge. See following figure for allowed clip locations.
Note the following:
z
For each module, use four sets of stainless steel hardware (each set: 5/16”- 18 hex head bolt
at 8mm diameter, hex nut, two flat washers, and a spring lock washer). Hex bolt length will be
dependent on the tracker open rack mounting frame.
To install a module:
1. Place a flat washer on the hex head bolt and insert the bolt through the tracker open rack mounting
frame hole.
2. If required, place a clip backing plate over the bolt, between the tracker open rack frame and the
frameless clamp, to support the frameless mounting clip overhang on each side of the rail.
3. Insert the bolt through the frameless module clip mounting hole; then install a second flat washer and
a spring lock washer over the bolt.
4. Install a hex nut and tighten each of the four 5/16”-18 assemblies to 15 foot-pound.
4-color
2-color
1-color
4-color
1-color